Question no 4248 : Source Determination Calculation for Manual PR

In SAP S/4, study the Quota Arrangement and choose the correct statements ?
Additional setting:
Source List: Vendor "V01" with Fixed indicator
Next Manual PR is 800pcs to be considered for the Source Determination.

Assuming Quota Based Qty is 0 for both Vendors


(more than one answers)

A)  The Quota Rating for Vendor V01 is 1166
B)  The Quota Rating for Vendor V02 is 2134
C)  The Quota Rating for Vendor V02 is 1067
D)  The next PR for 800pcs will select Vendor V02
E)  The next PR for 800pcs will select Vendor V01

Answer: A, C, D

Quota Rating = (Quota Allocated Qty + Quota Base Qty) / Quota
Rule 1: Select the Vendor with the lower Quota Rating
Rule 2: If the Quota Rating is the same, select Vendor with the higher Quota
Quota Rating Calculation
Quota Rating for Vendor V01: (1166 + 0) /1 = 1166
Quota Rating for Vendor V02: (2134 + 0) /2 = 1067 
Select Vendor V02 as it has the lower Quota Rating
New Allocated Qty after PR is SAVED
Quota Allocated Qty for Vendor V01: 1166
Quota Allocated Qty for Vendor V02: 1067 + 800 = 1867

Additional note:
in S/4: the Source List in not required to use of Quota Arrangement in MRP run
in S/4: the Quota Arrangement Usage in MRP2 view is not longer required
Fixed indicator in the Source List has no impact to Source Determination using the Quota Arrangement