A) Dynamic Modification rule cannot be created without Sampling Scheme.
B) A "Skip" Stage do not require Inspection Severity.
C) Update of Quality Level can be set at Usage Decision level or Purchase Order creation stage.
D) Setting Relationship between the Sampling Procedure to Dynamic Modification links the DMR to the Sampling sizes with or without Sampling Scheme
E) DMR can be assigned to the Material Master Inspection Type detail.
.
(more than one answers)
Answer: A, C
A) Dynamic Modification rule can be created with or without Sampling Scheme (there is a Severity Selection "001" Inspection without Sampling Scheme) for the Stage.
B) "Skip" Stage do not require Inspection Severity while an "Initial" Stage requires entry of Inspection Severity.
E) DMR can be assigned to: Material Master Inspection Type detail, Inspection Type Header, or Inspection Characteristics level in the Inspection Plan Operations
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.