This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes
Saturday, May 31, 2025
Thursday, May 29, 2025
Wednesday, May 28, 2025
Question no 4050 : Pull List
Tuesday, May 27, 2025
Monday, May 26, 2025
Sunday, May 25, 2025
Question no 4049 : Stock Determination Rule for Production Order Pull List
(only one answer)
A. Material Master.
B. Order Type Plant dependent Parameter.
C. Order Type.
D. Plant.
E. Movement Type.
.
Answer: D
Friday, May 23, 2025
Thursday, May 22, 2025
Monday, May 19, 2025
Question no 4048 : Movement Type with results in Accounting Document
(more than one answers)
A. "101"
B. "103"
C. "122"
D. "124"
E. "105"
Answer: A, C, E
A) "101" is standard GR movement type with FI posting.
B) "103" is non-valuated GR-Blocked stock and with no FI posting.
C) "122" is return delivery for Material Document origin with "101" and therefore with FI posting.
D) "124" is return delivery for Material Document origin with "103" and therefor with no FI posting.
E) "105" is released of non-valuated GR-Blocked stocks results in FI posting.
Friday, May 16, 2025
Tuesday, May 13, 2025
Monday, May 12, 2025
Saturday, May 10, 2025
Question no 4047 : Return Delivery movement type mapping
(more than one answers)
A. Return Delivery activity in MIGO with ref to Material Doc with Movement Type 101 to 122.
B. Return Delivery activity in MIGO with ref to Material Doc with Movement Type 105 to 124.
C. Return Delivery activity in MIGO with ref to Material Doc with Movement Type 103 to 124.
D. Return Delivery activity in MIGO with ref to Material Doc with Movement Type 109 to 122.
E. Return Delivery activity in MIGO with ref to Material Doc with Movement Type 107 to 124.
Answer: A, C, D
B) Movement Type "105" is to Release the Non-Valuated GR-Blocked Stock where "105" results in FICO Posting, and Return Delivery will be using Movement Type "122" with FI Reversal Postings.
C) Movement Type "103" (non valuated GR-Blocked Stock) will be using Movement Type 124" for the Return Delivery (no Accounting).
D) Movement Type "109" is to Released Valuated GR-Blocked Stock for initial GR Movement Type "107", and Return Delivery for Movement Type "109" will be "122" as it is Valuated.
E) Movement Type "107" is GR into Valuated Blocked Stock and its Reversal uses standard SAP Movement Type "109".
- To Cancel uses Movement Type "102" (not Return Delivery) for Movement type "101" while Return Delivery will use Movement Type "122" (with FI Posting); both "102" and "122" results in FI Postings but "122" is for Return Delivery while "102" is to Cancel the Goods Receipt.
- To Cancel uses Movement Type "104" for Movement Type "103" while Return Delivery will use Movement Type "124" (without FI Posting), both "104" and "124" results in NO FI Postings but "124" is for Return Delivery while "104" is to Cancel the Non-Valuated GR-Blocked Stock GR.
Thursday, May 8, 2025
Q&A in Class (2025-05-09) S4220
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: Review Strategy "30" in S/4HANA 2023 without Advanced Planning
Answer: In SAP Production Planning (PP), Planning Strategy 30, also known as Production by Lot Size, is a strategy for managing production based on planned independent requirements (PIRs) and sales orders. It's commonly used by companies that produce for stock (Make-to-Stock, or MTS) but also need to cater to specific customer demands. This strategy is beneficial for companies that produce for major customers and may also want to sell smaller quantities from stock.
https://froggysap.blogspot.com/2025/05/blog-post_5.html
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: Steps for Create "Transaction Calls" in MD04.
https://froggysap.blogspot.com/2025/05/sap-pp-md04-transaction-calls.html
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: Introduction to Strategy "52" as compared to Strategy "50".
Answer: In SAP, Strategy 52 is a planning strategy used in Production Planning (PP) where production of finished goods (FERT) is based on actual sales orders, but components and semi-finished goods (HALB) are procured based on Planned Independent Requirements (PIRs). This means raw materials and intermediate products are produced in anticipation of demand, while finished goods are produced only when a customer order arrives.
- Planning without Final Assembly: The core principle is "planning without final assembly," meaning production of the finished product is triggered by actual sales orders rather than planned independent requirements for the finished good.
- PIR-Based Procurement: Raw materials and semi-finished goods are procured based on planned independent requirements (PIRs), allowing for proactive inventory management and smoothing out production.
- Sales Order Triggered Production: The finished product (FERT) is produced only when a sales order arrives, ensuring that finished goods are only produced to meet actual customer demand.
- Unrestricted Stock: After production, the stock of the finished product is updated into unrestricted stock, meaning it is not specific to any particular sales order.
https://froggysap.blogspot.com/2025/05/sap-pp-planning-strategy-52-s4-2023.html
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: Is Safety Stock included in "Days Supply Calculations" ?
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: "Graphics Chart" issue in "Material Coverage" Fiori App.
Answer: Both the "Graphics Chart" definition as well as the "Shortage Definition" affects if the Material/Product is show as Shortage in the "Material Coverage" Fiori App (App ID F0251).
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: Materials with what Strategy that is suitable to use Safety Stock functionality ?
- Finished Goods: Safety stock for finished goods prevents running out of products to fulfill customer orders, especially during peak seasons or unexpected demand spikes.
- Make-to-Order Strategy FG are unlikely suitable to keep Safety Stocks for the FG level itself. (eg: Strategy 20, 50 or 60.)
- Make-to Stock Strategy FG that are popular in demand are possible candidates for Safety Stock for the FG level. (eg: Strategy 11, 10, 30, or 40). AND maybe even Strategy 74 for Sub-Assembly PIR since it is likely a common Assembly for multiple Finished Products.
- Raw Materials: Safety stock for Raw Materials ensures that production isn't interrupted by component shortages. It's a buffer against variations in demand or supply disruptions. Characteristics of Raw Materials suitable to implement some levels of Safety Stocks:
- Raw materials with high demand variability: Think of products like umbrellas, which have seasonal demand, or items with fluctuating demand due to trends or events.
- Raw materials with long lead times: Materials sourced from overseas or with complex production processes can benefit from safety stock to cover potential delays.
- Raw materials where suppliers are unreliable: If a supplier is known for inconsistent delivery or has a history of shortages, building safety stock can help mitigate risk.
- Raw materials for seasonal products: Items like holiday decorations or back-to-school supplies can benefit from anticipatory purchasing and holding safety stock.
- Raw materials for niche or specialized products: Products that are only sold in specific geographic areas or with limited market demand might need safety stock to avoid overstocking.
- Often many other factors also affect Safety Stock decisions:
- Storage Space and Storage Costs: Warehouse Space, Insurance Costs, Operations Costs to keep Inventory are considerations to decide the amount of Safety Stocks.
- Cost of Holding Inventory: Excess safety stock increases storage costs, obsolescence, and tying up capital.
- Material Expiration: When Materials have short Expiration dates, it is undesirable to have a large Safety Stocks.
- Minimum Remaining Shelf Life: Minimum amount of time for which the material must keep upon goods receipt for the goods receipt to be accepted by the system.
- Pilferage: The longer you keep the Stocks in the Warehouse, there will always possibly be lost or quality depletion especially higher levels of Safety Stocks.
- Length of Product Life-Cycles: When PLC or Product Life-Cycle is short, it is undesirable to have large quantities of Safety Stocks.
- Common or Unique Components for Assembly: When the Raw Materials are Common input Material to multiple Assemblies, higher Safety Stock is possible as there are loswer risk of Material Obsolesce.
- Lead time Variability: The time it takes to receive new inventory can fluctuate, not only affecting the Reorder point quantity as well as the Safety Stocks.
- Cost of Stock outs: The financial and reputational impact of running out of stock (e.g., lost sales, customer dissatisfaction) influences the desired Service Level.
- Review and Adjustment: Regularly review safety stock levels and adjust as needed based on changing conditions and performance data.
https://www.researchgate.net/publication/Inventory_and_Safety_Stock_Optimization
https://www.researchgate.net/publication/382398114_Enhancing_Inventory_Management_through_Safety-Stock_Strategies-A_Case_Study
https://www.youtube.com/Safety Stock Formula: 4 Top Mistakes/
https://www.youtube.com/How To Figure Out Safety Stock/
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: How Down Times are reflected to the PPDS Resources specially in the DS Scheduling Board ?
- Manually entered in the APO Resource Master in order for the Down Time to be recognized in PPDS.
- Integration via Plant Maintenance Equipment (interfaces with PP Work Center) where Maintenance Orders for Breakdown, Preventive are reflected automatically as Down Times until the PM Orders are TECOed.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: Provide information on the Handling Unit Track-and-Trace Functionality in S/4HANA ?
Answer: Handling unit track-and-trace is supported by "SAP Logistics Business Network Global Track and Trace" Solution; also referred to as SAP LBN GTT. The new SAP BN GTT can be considered the Cloud-based successor of the classic Event Management (released in 2004). SAP Global Track and Trace (GTT) was officially released on March 16th, 2024.- Real-time tracking: Global Track and Trace enables businesses to monitor the movement of goods and shipments in real-time, from origin to destination.
- Enhanced visibility: It provides a comprehensive view of the supply chain, including inbound, intracompany, and outbound shipments, as well as order fulfillment processes.
- Improved decision-making: Real-time data and predictive analytics help businesses identify potential delays, bottlenecks, or disruptions, allowing for proactive adjustments and improved decision-making.
- Enhanced customer experience: By providing accurate and timely updates on shipment status, businesses can improve customer satisfaction and build trust.
- Cost optimization: By identifying and addressing inefficiencies in the supply chain, Global Track and Trace can help reduce costs associated with transportation, warehousing, and inventory management.
- Compliance and regulatory adherence: It can help businesses meet regulatory requirements related to tracking and tracing of goods, especially in industries like pharmaceuticals and food.
- Supply chain risk management: By providing insights into potential risks and disruptions, Global Track and Trace can help businesses mitigate those risks and ensure supply chain resilience.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: Review on DDMRP Mechanics in the SAP system.
- Focus: Primarily concerned with managing production and inventory based on a pre-defined production plan via Planned Independent Requirements.
- Strengths: With feasible Sales and Operations Planning (SOP), it is a collaborative planning to optimize inventory levels, improves production efficiency, enhances planning accuracy, and reduces costs.
- Limitations: Less adaptable to real-time demand changes, can lead to excess inventory, and may not effectively address supply chain variability.
- Focus: Manages material flow in manufacturing and distribution, taking into account both demand and supply variability.
- Strengths: Improved supply chain responsiveness, reduced time-to-market, enhanced visibility, and reduced stock outs.
- Limitations: May require a more significant investment in initial setup and planning for Safety Stocks planning.
https://froggysap.blogspot.com/2024/08/exploring-demand-driven-replenishment.html
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: Predictive Forecasting Fiori App review.
Answer: The goal of predictive material and resource planning (pMRP) is to identify potential capacity issues and to evaluate possible solutions as early as possible based on a simplified requirements plan using a simplified material requirements algorithm. As a result of the simulation, production planners are prepared to take decisions on changed conditions, for example with regard to demand planning, resource plans, preproduction, or make-or-buy decisions.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: How IBP data integration with the S/4HANA backend ?
Answer: In SAP S/4HANA, data is collected and transformed into a simplified format and stored in database tables. The content of the tables can be transferred to SAP IBP via SAP HANA Smart Data Integration (SDI) and the OpenAPI.
Here's a more detailed breakdown:- Data Collection and Transformation in S/4HANA:
- Data is collected and transformed into a simplified format within S/4HANA.
- This simplified data is then stored in database tables.
- An integration model in S/4HANA defines which attributes of the master data, transactional data, and configuration data are to be transferred.
- Transfer to IBP:
- The simplified data in S/4HANA tables is transferred to IBP using SAP HANA Smart Data Integration (SDI).
- SDI uses the OpenAPI interface to facilitate the data transfer.
- This allows master data and transactional data to be transferred to IBP for both time-series-based planning (like in SAP IBP1 and SAP8) and order-based planning.
- Planning and Forecasting in IBP:
- The transferred data from S/4HANA becomes available for use in both order-based and time-series-based planning within IBP.
- Users can then perform demand forecasting and other planning activities in IBP based on this data.
- Integration Back to S/4HANA:
- The SAP S/4HANA, supply chain integration add-on for SAP Integrated Business Planning also enables the creation of orders that can be integrated back from IBP to S/4HANA, according to SAP Help Portal.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Question: What are some common transactions for PP Classic and APO in S/4HANA ?
Also see the following link of how to Upload or Download Favorites:
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Wednesday, May 7, 2025
Question no 4046 : Serial Profile for Plant Maintenance
(only one answer)
A. Equipment Master
B. Equipment Category
C. Material Type
D. Material Master Plan/Storage view
D. Material Master Equipment view
.
Answer: D