In SAP S/4 1909, with the following settings, with the Material Master for the PO activated for Inspection Type "01", when the Goods Receipts of the POset with "NO" Certificate Enclosed, what are the expected results ?
(more than one answers)
A) The Inspection Lot is set with "CROK" status.
B) The Inspection Lot is set with "CTCM" status.
C) Goods Receipt is not allowed.
D) Usage Decision is not allowed.
E) Inspection Results Recording is not allowed.
.
Answer: B, D
Notice Control Without Certificate Parameter
is set with "Without Lot Blocked Stock, with Lot: Status", Without a Certificate at GR mean the status will be "CTCM" (Certificate Missing). RR is possible but UD is not possible.