Question 49

The key of Material Requirement Planning (MRP) is the assignment of the MRP Type in MRP 1 data view of each Material, what are the choices of MRP Type offered in S/4 HANA system ?

(multiple answers) 

A)      Master Production Scheduling.
B)      Reorder Point Planning.
C)      No Planning.
D)      Forecasting.
E)      Integrated Business Planning.

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question 50

The sequence of an MRP run mechanics can be depicted by which of the following?

(only one answer) 

A)      Net Requirement - Procurement Type - Lot Sizing - Scheduling - BOM Explosion.
B)      Scheduling - BOM Explosion - Net Requirement - Procurement Type - Lot Sizing.
C)      Lot Sizing - Net Requirement - Procurement Type - Scheduling - BOM Explosion.
D)      BOM Explosion - Net Requirement - Procurement Type - Lot Sizing - Scheduling.
E)      Net Requirement - Lot Sizing - Procurement Type - Scheduling - BOM Explosion.

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question 51

SAP Bill of Materials is used in which of the following processes?

(multiple answers) 

A)      Subcontracting procurement.
B)      Production orders. 
C)      Consignment procurement.
D)      Product costing.
E)      MRP run.

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question 52

In SAP, ________ defines the specific purpose for which a Bill of Materials (BOM) is created, allowing different departments like engineering, production, and costing to manage their own versions of the product's component list, which can be tailored to their distinct processes. This feature is used to maintain separate Bill of Material for the saame assembly for each business area, ensuring that only the necessary information is used by each department. 

(multiple answers) 

A)      BOM Application.
B)      BOM Item Category.
C)      BOM Alternative. 
D)      BOM Usage.
E)      BOM Header.

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question 53

What unique identifies a Routing is which of the following?

(only one answer) 

A)      Routing Group number and Group counter.
B)      Routing Group number, Group counter, and Plant. 
C)      Routing Group number and Plant. 
D)      Plant. 
E)      Routing Group number, Group counter, Routing Usage, and Plant. 

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question 54

A company states the following business requirement for Manufacturing Operation Planning:
• Create an optimal Business Plan to drive growth and increase market share.
• Balance Demand and Supply in the Supply Chain.
• Cloud-based tool.
• Using Excel as tool for the Planning process.
• End-to-End visibility on strategic, tactival, and operational plans via external and internal data.
Which of the following SAP components would you recommend the customer?

(multiple answers) 

A)      MPS.
B)      IBP.
C)      LTP.
D)      DDMRP.
E)      MRP.

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question 55

S/4HANA Embedded Advanced Planning via "Production Planning and Detail Scheduling" (PPDS) requires which of the following pre-requisites?

(multiple answers) 

A)      Plant and Materials to be mapped as APO Locations. 
B)      Work center to be mapped to APO Resources.
C)      BOM and Routing to be mapped via Production Version as PPM and PDS.
D)      BOM and Routing to be mapped via Production Version as PDS.
E)      Activate Advanced Planning in the Material Master. 

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question 56

What are choices of Material Planning Run in the S/4HANA system?

(multiple answers) 

A)      MPS.
B)      MRP.
C)      LTP.
D)      MRP Live.
E)      PPDS.

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question 57

The production department of a company notify of the following Production Type requirements:
• Continuously produce large quantities of standardized products.
• Using a streamlined, high-volume process.
• High product stability.
• Product with less product complexity than Discrete manufacturing.
Which of the following Production Type would you recommend?

(multiple answers) 

A)      Production Orders.
B)      Process Orders.
C)      Repetitive Planned Orders.
D)      Kanban.
E)      Internal Orders.

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------