In SAP MM and PP, which of the following are mandatory fields in the MRP 1 and MRP 2 view of the Material Master ?
(more then one answers)
A) MRP type.
B) MRP controller.
C) Lot Sizing rule.
D) Re-order point.
E) Safety stock.
.
(more then one answers)
A) MRP type.
B) MRP controller.
C) Lot Sizing rule.
D) Re-order point.
E) Safety stock.
.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.