Question no 1116 : MRP view

In SAP MM and PP, which of the following are mandatory fields in the MRP 1 and MRP 2 view of the Material Master ?

(more then one answers)

A)    MRP type.
B)    MRP controller.
C)    Lot Sizing rule.
D)    Re-order point.
E)    Safety stock.
.