Question no 4285 : MRP Live

 In SAP S/4, what are the CORRECT depictions of MRP Live ?


(more then one answers)

A)  The Program will no no longer create MRP lists.
B)  The Program will no longer create Stocks Requirements lists.
C)  Scheduled Jobs or immediate runs can be setup using this FIORI App.
D)  Option to perform MRP run with or without Production Versions.
E)  To run this APP, make sure the user has the authorization to run MD01N in S/4 backend
.

Answer: A, C, D

S/4 backend of MRP Live is MD01N and as "Schedule MRP Run" FIORI App
Features:
The Planning scope is more flexible than classic MRP t-codes
MD01N replaces MD01, MDBT, MD02 and MD03
Cross Plant Planning is available without need for Scope of Planning (for classic MD01 or MDBT)
For features not yet supported in MRP Live, system will revert to plan material as of Classic MRP
MRP Live will not be generated
S/R List will still be generated