Question no 1123 : Re-order Point Planning

In SAP MM and PP, the Re-order Point Planning logic contains which of the following characteristics ?

(more then one answers)

A)     The Planning run only does forward scheduling for this logic.
B)     Static lot size is logical, and Periodic lot size may not be.
C)     Procurement type can only be external procurement.
D)     An ROP material can be assigned to the BOM as a BOM component.
E)     Automatic source determination via source list is not possible for this planning logic.
.