Question no 1082 : Scheduling Margin Key

In SAP MM & PP -Consumption based Planning, which of the data element within the SMK (Scheduling Margin Key) is relevant ?

(only one answer)

A)     Opening Period.
B)     Float before Production.
C)     Float after Production.
D)     Release Period.
E)     GR processing time.
.