Question no 1094 : Lot Size calculation

In SAP MM PP, Please use the following information to derive the expected MRP calculation results of the Lot Size ?

Current Stocks = 50
No other MRP element exist except the following
      one Purchase Order of 250 within the Replenishment Period.
      one Reservation of 50 with the Replenishment Period.
Safety Stock is 0
MRP type is Re-Order Point "VB" with ROP at 500
Lot Sizing key is "EX"  and Maximum Lot Size is 100
Rounding Profile of the following
     1 - 99 round to 20
     100 - 599 round to 100
     599 - 9999 round to 500

(only one answer)

A)    A Planned Order 200 and Another Planner Order of 60.
B)    Two Planned Orders 100 each and Another Planner Order of 60.
C)    13 Planned Orders of 20 each.
D)    A Planned Order of 300.
E)    A Planned Order of 260.
.