In SAP MM PP, Please use the following information to derive the expected MRP calculation results of the Lot Size ?
Current Stocks = 50
No other MRP element exist except the following
one Purchase Order of 250 within the Replenishment Period.
one Reservation of 50 with the Replenishment Period.
one Purchase Order of 250 within the Replenishment Period.
one Reservation of 50 with the Replenishment Period.
Safety Stock is 0
MRP type is Re-Order Point "VB" with ROP at 500
Lot Sizing key is "EX" and Maximum Lot Size is 100
Rounding Profile of the following
1 - 99 round to 20
100 - 599 round to 100
599 - 9999 round to 500
(only one answer)
A) A Planned Order 200 and Another Planner Order of 60.
B) Two Planned Orders 100 each and Another Planner Order of 60.
C) 13 Planned Orders of 20 each.
D) A Planned Order of 300.
E) A Planned Order of 260.
.
Answer: B
ReplyDelete