In SAP S/4, note the dialogue when creating a Production Order of a Material applied with a certain type of ECM Change Master, which will result in BOM items selected due the the Change Master, what Change Master scenario is this ?
(only one answer)
A) ECM with Object Dependency
B) ECM with "incomplete copy control" status
C) ECM with Parameter Effectivity
D) ECM with a Release Key
E) ECM with a Configurable scenario.
.
Answer: C