A) When the Production Order is first created at "CRTD" status.
B) Regardless of the system status of the Production Order, as long as the Order-type Dependent Parameter at the Plant level is set with the same "Control Lot Ceation" indicator "Early lot creation for the Order item".
C) The last operation of the Routing for the Production Order is assigned with a Control Key with "Early lot creation for the Order item".
D) If the Production Order is dispatched to the Shop Floor and updated with system status "DSPT".