This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Wednesday, October 22, 2025

Question no 4074 : Physical Sample Drawing Procedure basic setup

In SAP Quality Management as at S/4 1909, which of the following settings are pre-requisites for Physical Drawing Procedure Inspection Lots ?

(more than one answers)

A) Sampling Procedure require Inspection Point type "Sample Management".
B) Master Inspection Characteristics require Inspection Point type "Sample Management".
C) Material Master QM view Inspection type activated with Inspection Point type "Sample Management".
D) An appropriate Inspection Point to be assigned to Inspection Plan header.
E) An appropriate Inspection Point to be assigned to Material Specification.
.

Answer: A, D

A, B, C) The Inspection Point type "Sample Management" is an indicator found in Sampling Procedure which is a pre-requisite for the scenario. However, there is no setting in the Master Inspection Characteristics OR Material Master QM view that is required to activate for "Physical Sample Management". 
D, E) Only the Inspection Plan header has and must be assigned with an appropriate Inspection Point with an Inspection Point type "Physical Sample". It is important to note that Material Specification do not support Sampling with "Physical Sample". 

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.