In SAP Materials Management ECC6.0 EhP8, AMPL is used for which of the following ?
(only one answer - selected the most appropriate)
A) MPN Material.
B) Batch Material.
C) Non-Valuated Material.
D) Split Valuation Materials.
E) Non of the above.
.
Answer: A
AMPL or Approved Manufacturer Parts list is required (like a source list) for MPN or Manufacturer Part Number Materials provided that the MPN Profile assign to the Internal Material is set with AMPL requirement.
(only one answer - selected the most appropriate)
A) MPN Material.
B) Batch Material.
C) Non-Valuated Material.
D) Split Valuation Materials.
E) Non of the above.
.
Answer: A
AMPL or Approved Manufacturer Parts list is required (like a source list) for MPN or Manufacturer Part Number Materials provided that the MPN Profile assign to the Internal Material is set with AMPL requirement.
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.