This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Wednesday, March 11, 2015

Question no 2755 : Assignments to Inspection Characteristics

In SAP QM ECC6.0 EhP6, which of the following assignments to Inspection Characteristics in the Inspection Plan is NOT correct ?

(more than one answers)

A)   Test Equipments can be assigned directly to the Inspection Characteristics.
B)   A work center is required at the operation level before Inspection Characteristics can be assigned to the operation.
C)   Only one sampling procedure can be assigned to each Inspection Characteristics in an Operation.
D)   Dependent characteristics specifications can be assigned to referenced Master Inspection Characteristics.
E)   The Control Indicators in the Inspection Characteristics assigned to the Inspection Plan operation can always be changed.
.

4 comments:

  1. A) Assignment of PRT (Test Equipment) is only to the Operation. When the Master Inspection Characteristics has a Test Equipment indicator in the Control folder, if it is assigned to the Operation in the Inspection Plan, then you need to appoint which PRT from the Operation is for the Inspection Characteristic. So, the assignment is Indirect.

    ReplyDelete
  2. B) Work Center field is always not mandatory in Inspection Plan.

    ReplyDelete
  3. D, E) When it is a Referenced Master Inspection Characteristics, Control DATA, Dependent Characteristics are all not possible.

    ReplyDelete

Note: Only a member of this blog may post a comment.