In SAP MM and PP, which of the following setting or configuration is possible for the Planning Horizon ?
(more then one answers)
A) It can be set at the Plant level of the Material Master MRP2 view.
B) It can be set at the Plant parameter level in the configuration.
C) It can be set at the Movement type level in the configuration.
D) It can be set at the MRP Controller level in the configuration.
E) It can be set at the MRP Group level in the configuration.
.
(more then one answers)
A) It can be set at the Plant level of the Material Master MRP2 view.
B) It can be set at the Plant parameter level in the configuration.
C) It can be set at the Movement type level in the configuration.
D) It can be set at the MRP Controller level in the configuration.
E) It can be set at the MRP Group level in the configuration.
.
Answer: B, E