In SAP MM & PP, Please use the following information to derive the expected MRP calculation results of the Lot Size ?
Current Stocks = 100
No other MRP element exist for the Material.
Safety Stock is 150
MRP type is Re-Order Point "VB" with ROP at 500
Lot Sizing key is "EX" and minimum lot size is 200, maximum lot size is 300
(only one answer)
A) A Planned Order of 300 and Another Planned Order of 300.
B) A Planned Order of 300 and Another Planned Order of 400.
C) A Planned Order of 300 and Another Planner Order of 200.
D) A Planned Order of 500.
E) A Planned Order of 400 and Another Planner Order of 150.
.
Current Stocks = 100
No other MRP element exist for the Material.
Safety Stock is 150
MRP type is Re-Order Point "VB" with ROP at 500
Lot Sizing key is "EX" and minimum lot size is 200, maximum lot size is 300
(only one answer)
A) A Planned Order of 300 and Another Planned Order of 300.
B) A Planned Order of 300 and Another Planned Order of 400.
C) A Planned Order of 300 and Another Planner Order of 200.
D) A Planned Order of 500.
E) A Planned Order of 400 and Another Planner Order of 150.
.