(more then one answers)
A) Only a "Fixed Lot Size" Lot-Sizing Key is possible.
B) Both Manual and Automatic Re-Order Point Calculation is possible.
C) It is designed for external procurement materials.
D) The Scheduling Margin Key is not relevant for the material master.
E) The Material cannot be included in a Bills of Material.
.
Answer: A, C, D, E