In SAP MM, for a CBP-based material master, you may perform the following assignments /?
(more then one answers)
A) A CBP-based material cannot be assigned to a BOM that contains PP-MRP materials.
B) A CBP-based material should not contain BOM components.
C) A CBP-based material can be a BOM component of the Assembly of a PP-MRP material.
D) A CBP-based material can be a BOM component of the Assembly of a CBP-based material.
E) A CBP-based material can only be assigned to a BOM with only CBP-based materials.
.
Answer: B, C, D
ReplyDelete