Question 4100 : MRP Area

In SAP PP for MRP Area as at S/4 1909,

(more than one answers)

A)  An MRP area can have one or more default "Receiving Storage Location".
B)  An MRP area can have one or more MRP area Storage Locations.
C)  An MRP area for Storage Location must be created with 5 or more Alphanumeric code.
D)  An MRP area must be assigned with an Address for default to Purchase Order Delivery address.
E)  MRP area must be activated in the MRP Plant Parameter before it can be created.
.

Answer: B, C