In SAP PPDI or PPPI as at ECC6.0 EhP6, which of the following is not a Planning Module in PP ?
(only one answer)
A) SOP.
B) LTP.
C) MPS.
D) MRP.
E) SFC.
Answer: E
SFC = Shop Floor Control is an Execution Module.
(only one answer)
A) SOP.
B) LTP.
C) MPS.
D) MRP.
E) SFC.
Answer: E
SFC = Shop Floor Control is an Execution Module.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.