This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Friday, September 20, 2024

Question no 4015 : Material Type Qty and Value Update control for Purchasing Scenario

In SAP Material Management, which of the following, which of the following Material results in when Purchase Order creation requires an Account Assignment ?


A. Materials with Material Type for the Plant without Qty and without Value update.
B. Materials with Material Type for the Plant with Qty updated but without Value update.
C. Materials with Material Type for the Plant without Qty update but with Value update.
D. Materials with Material Type for the Plant with Qty and Value update.
E. All of the above.

Answer: A, B

A. Material type "without Qty update" and "without Value update" - an example of Material Type "NLAG" (Non-Stock Material) is a case of Purchase Order that requires Account Assignment which is an example of Consumables Scenario.

B. Material type "with Qty update" and "without Value update" - an example of Material Type "UNBW" (Non-Valuated Material) is also a case of Goods Receipt with Qty and Stocks no longer have Value as Values are charged to Account Assignment in the Purchase Order at Goods Receipt.

C. It is not possible to configure a Material Type "without Qty update" and "with Value update".

D. For Materials created using Material Type settings with Qty updating and with Value updating is designed basic practice of Material receiving into Stock with Quantity as well as Stock value. 

Q&A in Class (2024-09-20) S4500

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question: What is the difference and use of the Purchasing Group assign in the Material Master and the Business Partner Vendor?

Refer to the Blog Post link below for the detail demonstration of the above scenario:
https://froggysap.blogspot.com/2024/09/sap-mm-purchasing-group-in-material.html

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question: Demonstrating the Accounting Posting of Material with Standard Price and Moving Average Price from PO, GR to Invoice entry with Material Ledger in S/4HANA 2023.


Refer to the Blog Post link below for the detail demonstration of the above scenario:

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question: How the Planned Delivery Time in the Vendor Master and Planned Delivery Time in the Material Master are DEFAULTED to the Purchasing Info Record, and subsequently these 3 Planned Delivery Times are further Defaulted to the Purchase Requisition or Purchase Order?


Refer to the Blog Post link below for the detail demonstration of the above scenario:
******* PENDING ******* 

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question: the Case and processing step for LEAN Service introduced in S/4HANA.


Refer to the Blog Post link below for the detail demonstration of the above scenario:

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question: Show again the basic processing steps for Self-Service Procurement.


Refer to the Blog Post link below for the general demonstration of the above scenario:

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Summary of Exercise Requirement for Auto PO and Source List Requirement 




--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Q&A in Class (2024-09-13) PLM310

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question: Provide commonly used t-code list for Preventive Maintenance Processing.

Refer to the Blog Post link below:
https://froggysap.blogspot.com/2024/09/plant-maintenance-common-t-codes-and.html

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question: Task List Costing explanation in more detail.

Refer to the Blog Post link below:
https://froggysap.blogspot.com/2024/09/sap-pm-md-task-list-costing.html

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question: Maintenance Plan Costing Simulation online and background


In IP31 for calculating Maintenance Plan Costing step must be:
  1. Run selected Maintenance Plan in the Background (Immediate or Scheduled)
  2. Display Costing
Refer to the Blog Post link below:
https://froggysap.blogspot.com/2024/09/sap-pm-maintenance-plan-costing-ip31.html

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Wednesday, September 11, 2024

Question no 4014 : a new Plant setup for Material Ledger

In SAP Controlling, when activating a new Plant for Material Ledger in S/4, which of the following are relevant ?

A) Material Type requires Quantity and Value update setting for the new Plant.
B) CKMSTART required for Production Start-ups for Material Management.
C) Assign an appropriate Material Ledger type to the Plant/Valuation area.
D) Ensure no Material Management Postings before Material Ledger activation was completed.
E) When creating the first material, do not forget to select "ML" to activate the Material Ledger in the Accounting view
.

Answer: A, B, C, D

A) If Material Type is without Qty and Value Update, the Material created with that Material Type will still be without Material Ledger.
B, D) CKMSTART is required to prepare postings to MM, it is therefore highly recommended to not have any MM Postings before CKMSTART.
C) Material Ledger Type assignment is the Pre-requisite to activate the Material Ledger for the new Valuation Area/Plant.

Refer to the latest STEPs recommended by SAP Documentation for Material Ledger activation depending on the version of SAP implemented.

Q&A in Class (2024-09-06) PLM300

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question: To show Simulation of Multi-Cycle Performance-Based Maintenance based on Engine Hours.


See the following Blog Post link for the detail presentation:
https://froggysap.blogspot.com/2024/09/sap-pm-multi-cycle-performance-based.html

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Question: The number 1-12 referring to Months of the Year, the 2 Technical Object which are Container 1 and Container 2 requires Monthly Maintenance as below:

Container 1: Preventive Maintenance is Month 1,2,3,4,5,6 and no need for Period 7-12

Container 2: Preventive Maintenance is Month 7,8,9,10,11,12 and no need for Period 1-6

And the same will repeat for the next year. 

In SAP, the Maintenance Plan created for Monthly Cycle will always create MO for ALL Periods, the question is how to avoid scheduling any MO for Periods 7-12 for Container 1 as well as to avoid scheduling any MO for Periods 1-6 for Container 2. 


Answer: Refer to the Blog Post link below for recommended Solution:
https://froggysap.blogspot.com/2024/09/sap-pm-fixed-and-skipped-status-use.html

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Monday, September 2, 2024

Question no 4013 : Factory Calendar

In SAP Logistics General, Factory Calendar created via SCAL can be assigned to which of the following ?

(more than one answers)

A. Purchasing Organization.
B. Plant.
C. Shipping Point.
D. Transportation Planning Point.
E. Maintenance Work Center.
.

Answer: B, C, E

Factory Calendar can be assigned to the
. Plant (for MM)
. Work Center (PPDI, PPPI, PS, PM, CS, QM for Capacity and Scheduling)
. Route (for Delivery date determination via Transit Time)
. Route (for Transportation planning date determination via Transportation Lead Time)
. Shipping Point (for Pick/Pack date determination)
. Shipping Point (for Loading date determination)
. Project Definition in PS
. WBS in PS
. Network Activity in PS
. Maintenance Order Header