In order to synchronize the Equipment number and Serial number, which of the following
is a setup requirement ? 
(only one answer)
A)   Assign a serial profile that contain the synchronization configuration to the equipment master.
B)   Assign a serial profile that contain the synchronization configuration to the material master Plant/Storage view.
C)   Assign a serial profile that contain the synchronization configuration to the equipment category.
D)   Assign a serial level on synchronization setting to the equipment category.
E)   Assign a serial level on synchronization setting to the material master Plant/Storage view.
.
Answer: E
ReplyDelete