Question no 3952 : Material BOM assignment in Plant Maintenance Object

In SAP Plant Maintenance, a Material BOM can be assigned to which of the following ?

(more than one answers)

A) Functional Location.
B) Equipment.
C) Measuring Point.
D) Permit.
E) Task List Header.

Answer: A, B, E

A, B) A Material BOM is assigned as a Construction Type in FL and EQ.
C, D) as at ECC6 EhP8 both MP and Permits do not have any facilitation for Material BOM assignments.
E) In the Task List Header, the Assembly field can also be assigned a Material BOM.




Wednesday, October 19, 2022

Question no 3951 : AMPL

In SAP Materials Management ECC6.0 EhP8, AMPL is used for which of the following ?

(only one answer - selected the most appropriate)

A) MPN Material.
B) Batch Material.
C) Non-Valuated Material.
D) Split Valuation Materials.
E) Non of the above.
.

Answer: A

AMPL or Approved Manufacturer Parts list is required (like a source list) for MPN or Manufacturer Part Number Materials provided that the MPN Profile assign to the Internal Material is set with AMPL requirement.














Monday, October 17, 2022

Question no 3950 : PP Strategy 40

In SAP PP ECC6.0 EhP8, which of the following are features of Strategy 40 ? 

(more than one answers)

A) It considers the Stocks.
B) It considers the Sales Order.
C) It considers the Planned Independent Requirement.
D) It considers the Firmed Planned Orders.
E) It considers the Safety Stocks.

Answers; A, B, C, D, E


Wednesday, October 12, 2022

Question no 3949 : Goods Movement to Maintenance Order

In SAP Plant Maintenance as in ECC6 EhP8, Goods movement can be done with reference to the Maintenance Order in which the following scenarios ?

(more than one answer)

A) Maintenance Order "CRTD" Created status.
B) Maintenance Order "REL" Released status.
C) Maintenance Order "TECO" Technical Completed status.
D) Maintenance Order "GMAL" Goods Movement allowed status.
E) Maintenance Order "CLSD" Business Closed status.
.

Answer: B, C

A) At Created status, the MM Reservations are set without the Movement Allowed indicator an therefore Goods Movement is not possible.

B) At Released status, the system automatically flags the Movement Allowed indicator in the MM Reservation items and therefore Goods Movement is now possible.

C) At TECO status, all Reservation items will be flagged with the Deletion Flag and therefore it is not possible for perform any Goods Movements for those Reservations already closed; but do be careful that in MIGO, you can still direct charge to the Maintenance Order even without the Reservations and this is called un-planned Goods Issue. To avoid this loop-hole, after TECO before Business Closing, we can use the User status business function to Stop the Goods Movement.


D) There is no "GMAL" system status.

E) At Business Closing or "CLSD" status, all MM or FI postings are disallowed.

Wednesday, October 5, 2022

Question no 3948 : Requirement Type in Sales Order line item

In SAP Sales & Distribution ECC6 EhP8, how can be the Requirement Type for a Sales Order line item be determined ?

(more than one answers)

A) Material Master Strategy Group in the MRP 3 view.
B) Strategy Group in the MRP Group parameter.
C) Strategy Group in the Plant parameters.
D) Item Category and MRP Type.
E) Item Category and MRP Group.
.

Answer: A, B, D

1. Requirements type via strategy group in the material master's MRP3 view, the strategy group's main strategy will be used to determine the Requiremen type.
2. MRP view was created without the strategy group, the system will then check if MRP group has been assigned in the MRP 1 data view; it will then look for the strategy group in the MRP group parameter and again the Requirement type in the main strategy will be used if any.
3. Assuming no MRP group is assigned in the MRP view but there is an MRP type in MRP 1 view then the system will use the MRP type plus the Sales order line item Category's Item Category to determine the Requirement type.
4. However, if the material was not even extended with an MRP view then the system proceeds to use only the Sales order line Item Category only to determine the Requirement type.
5. If still not found then the system will complain that Requirement type was not found.