This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Saturday, March 26, 2022

Question no 3930 : Advanced Planning in S/4

S/4 1809, when Advanced Planning is activated for a Material Master ?

(More than one answers)

A) A special Material type "X0" must be set in the MRP 1 view for using the Advanced Planning run.
B) Once activated for Advanced Planning, the Material cannot be planned using classic MRP run.
C) The Material can be planned using classic MRP, MRP Live, or Advanced planning PPDS. 
D) Planning parameters from Materials master to the Product master is in Display mode in the Product Master.
E) Re-Order Point Planning must still be executed in classic MRP run.
.

Answers: C, D

A) MRP type "PD" can be used. "X0" is for previous ERP with the external APO system.
B, C) Testing shows even Material activated for Advanced Planning, the Material can still be planned using PPDS, MRP Live or Classic MRP run. 
D) Transaction code /SAPAPO/MAT1 currently shows as Display even in Change Mode.
E) Re-Order Point Planning Heuristics is available in PPDS.



Saturday, March 19, 2022

Question no 3929 : PP/DS Horizon in S/4

In S/4 1809, the PP/DS Horizon is set in which of the following ?

(only one answer)

A) Plant Parameter.
B) MRP Group Parameter.
C) Product Master or Material Master.
D) MRP Type.
E) Planning Version.
.

Answer: E

Goto Logistics > Advanced Planning > Master Data > Planning Version Management > Model and Version Management (/SAPAPO/MWM)
Under the PP/DS Segment, there is PP/DS Horizon in Days.


Friday, March 18, 2022

Question no 3928 : PPDS Advanced Planning Make-to-Stock Strategy

In S/4 PPDS Advanced Planning, Make-to-Stock Strategy "40" is mapped to Product Master as which of the following Strategy ? 

(only one answer)

A)  10.
B)  20.
C)  30.
D)  40.
E)  50.
.
Answer: B



Question no 3927 : Planning Versions in Advanced Planning

In S/4 1809, which of the following are TRUE about Planning Versions in Advanced Planning ?

(more than one answers)

A) Planning Version 000 is the active version.
B) Planning Version 000 in Advanced Planning is mapped to Planned Independent Requirement version "00".
C) Operative Stock Requirements List will show Planning data similar to Planning Version 000 in the Product view in Advanced Planning.
D) When using other than Planning Version 000, all master data must be duplicated to that Planning Version.
E) Simulated Stock Requirement List in Long Term Planning's Scenario is mapped to each of the simulated Planning Versions other than 000 in Advanced Planning.

Answers: A, C

A, C) The Planning Version 000 is always the active version for Advanced Planning and is mapped to the Operative Stock Requirement List (MD04).
B) There are no relationships of the Version in PIR, the only thing that matters is the "active" indicator in the PIR.
D) All other Planning Version other than 000 can use the Operative Master data of version "000".
E) As at 1809, there are no link of LTP to Advanced Planning.

Wednesday, March 9, 2022

Question no 3926 : Product Type Group (S/4 1809)

In SAP S/4 1809, which of the following are correct about the Product type Group (for Material Master) ?

(more than one answers)

A) The Product type Group is defaulted from the Material Group.
B) The Product type Group is defaulted from the Material Type.
C) You can change the Product Type Group in the Purchase Order.
D) The Product Type Group can be used for Lean Service scenario.
E) The Product Type Group can be used for Lean Subcontracting scenario.
.

Answer: B, D

The Product type Group is optional assignment in the Material Type (OMS2), if it is set then the Material Master created with the Material Type for the Product type Group will follow a specific scenario. You can find the Product type Group in the Purchase Order line item but it cannot be changed. One of the new features associated with the Product Type Group "2" for Lean Services scenario (instead of using Service Master); however, the Service Entry of such Lean Service can be done via a Fiori App as at 1809.


Lean Service in S/4

Monday, March 7, 2022

Question no 3925 : Maintenance Order Type Parameter

In SAP PM as at ECC6.0 EhP7, which of the following are configurable via the Order Type Plant Independent Parameter ?

(more than one answers)

A)  Settlement Profile.
B)  Reorganization periods.
C)  Header User Status Profile.
D)  Operations User Status Profile.
E)  Activation of Commitment Management.
.

Answers: A, B, C, D, E

A, B, D (only Order Type an no Plant)
C, D (only Order Type an no Plant)