Question no 3781 : Inspection Interval

In SAP QM as at ECC6.0 EhP6, which of the following scenario is the "Inspection Interval" in the QM data view for ?

(only one answer)

A)  Interval between recurring inspection for the same batch.
B)  Total inspection time for an Inspection Lot.
C)  The minimum interval must past before the next inspection for an inspection lot can be generated.
D)  Interval between inspections for In-Process Quality Control for Production.
E)  Copied to the Maintenance Plan Header as the Cycle for Refurbishment scenario.
.

click "1 comment" to view possible solution
 

Tuesday, December 29, 2020

Question no 3780 : QM Specifications

In SAP QM as at ECC6.0 EhP6, which of the following combination is possible in QM Specifications assignment in the Inspection Type detail in the Material Master ?

(more than one answers)

A)  With Material Specification, but without Task List.
B)  Without Material Specification, but with Task List.
C)  With Material Specification, and with Task List.
D)  Without Material Specification, and without Task List.
E)  All of the above.
.

click "1 comment" for suggested solution


Monday, December 28, 2020

Question no 3779 : Vendor Sub-Range

In SAP MM as at ECC6.0 EhP6, which of the following is used to configure the allowed Sub-Range data level in the Vendor Master ?

(only one answer)

A)  Vendor Account Group.
B)  Plant Parameter.
C)  Purchasing Organization Parameter.
D)  Configuration not required.
E)  Transaction Code.
.

click "1 comment" for suggested solution

Wednesday, December 23, 2020

Question no 3778 : Material Master Storage Location data

In SAP MM as at ECC6.0 EhP6, which of the following data parameters are set at the Material Master Storage Location level ?

(more than one answers)

A)  Negative Stock.
B)  Storage Bin.
C)  Serial Profile.
D)  Stock Determination Group.
E)  Re-Order Point.
.

click "1 comment" to view suggested solution

Tuesday, December 22, 2020

Question no 3777 : Material Master data view

In SAP MM as at ECC6.0 EhP6, which of the following is not an Organizational Element for data views in the Material Master ?

(only one answer)

A)  Plant.
B)  Purchasing Organization.
C)  Storage Location.
D)  Warehouse Number.
E)  Company Code.
.

click "1 comment" to view possible solution

Monday, December 21, 2020

Question no 3776 : MMSC

In SAP MM as at ECC6.0 EhP6, which of the following parameters can be set via the T-Code MMSC ?

(more than one answers)

A)  Bin Number.
B)  MRP Control Indicator.
C)  Re-Order Point.
D)  Fixed Lot Size.
E)  Special Procurement Type/Indicator.
.

click "1 comment" to view possible solution

Wednesday, December 16, 2020

Question no 3775 : Control Key in PM

In SAP PM as at ECC6.0 EhP6, which of the following uses the Activity Rate and Confirmation to determine the actual cost in a Maintenance Order ?

(more than one answers)

A)  PM01.
B)  PM02.
C)  PM03.
D)  PM04.
E)  PM05.
.

Answers: A, E

A) PM01 is Internal Operations.
B) PM05 is Internal Operations with Services (eg: a Subsidiary is performing the Maintenance Services).
Both PM01, PM05 uses the Activity Type and Activity Price to determine the Prices, and via Confirmation to derive the costs.

Tuesday, December 15, 2020

Question no 3774 : Notification Type

In SAP PM as at ECC6.0 EhP6, which of the following scenario uses the Notification Type for its creation? 

(more than one answers)

A)  Create Equipment Swap via IE4N.
B)  Create Shift Note.
C)  Create Shift Report.
D)  Create Pool Asset Management Request.
E)  Create Permit Request.
.

Click "1 comment" for suggested solution.

Monday, December 14, 2020

Question no 3773 : IW8W

In SAP PM as at ECC6.0 EhP6, what does T-Code IW8W do ?

(only one answer)

A)  Refurbishment Goods Issue.
B)  Refurbishment Settlement.
C)  Refurbishment Goods Receipt.
D)  Refurbishment Maintenance Plan.
E)  Refurbishment Overhead Costs Creation.
.

Click "1 comment" to review suggested solution.

Wednesday, December 9, 2020

Question no 3772 : Availability Check in Maintenance Order

In SAP PM as at ECC6.0 EhP6, which of the following are configurable for Availability Check in a Maintenance Order ?

(more than one answers)

A)  Material.
B)  Capacity.
C)  PRT.
D)  Measuring Point.
E)  Permits.
.

Click "1 comment" for suggested solution.

Tuesday, December 8, 2020

Question no 3771 : Delay information in MRP run

In SAP PP as at ECC6.0 EhP6, which of the following MRP run provides Interactive Delay Information for Decision Making ?

(only one answer)

A)  Simulative MRP run.
B)  Interactive MRP run.
C)  Scope of Plan MRP run.
D)  Regenerative MRP run.
E)  Net Change MRP run.
.

Click "1 comment" for suggested solution

Monday, December 7, 2020

Question no 3770 : SOP and Planned Independent Requirement

In SAP PP as at ECC6.0 EhP6, which of the following are TRUE about SOP and Planned Independent Requirements ?

(more than one answers)

A)  The Planning Strategy Requirement Type is assigned when an SOP Plan for a Material is created.
B)  The Planning Strategy Requirement Type is assigned when each Planned Independent Requirement for a Material is created.
C)  A Planned Independent Requirement version can be either be Active or Not Active.
D)  A SOP Plan for a material can either be Active or Not Active.
E)  Only an Active SOP Plan for a material can be transferred to Planned Independent Requirement.
.

Answers: B, C, D

A) SOP level planning do not use any Strategies.
B) The PIR created is always with a Requirement Type from the Planning Strategy (either from the Material Master MRP3 view or the MRP Group).
C, D) Both PIR and SOP can be Active or Non Active.
E) Both Active or Non Active SOP Plans are transferrable to the PIR.

Wednesday, December 2, 2020

Question no 3769 : Cost Collector in PP

In PP as at ECC6.0 EhP6, which of the following can use a Cost Collector to collect costs ?

(more than one answers)

A)  Repetitive Planned Orders.
B)  Planned Orders for Shop Floor Production.
C)  Production Orders.
D)  Planned Independent Requirement.
E)  Planning Scenario.
.

Click "1 comment" for possible solution.

Tuesday, December 1, 2020

Question no 3768 : Control Features of the Repetitive Manufacturing Profile

In SAP PP as at ECC6.0 EhP6, which of the following are the Control Features of the Repetitive Manufacturing Profile ?

A)  Whether you want to backflush activities.
B)  Whether you want to work with reporting points in make-to-stock REM.
C)  How you want to process errors which occur when backflushing.
D)  Storage Location for Backflushing.
E)  Auto Goods Receipt indicator.
.

Answers: A, B, C

You use the repetitive manufacturing profile to control how you want to carry out planning and backflushing in repetitive manufacturing.
The repetitive manufacturing profile is a mandatory prerequisite for repetitive manufacturing. Using the control paramters, you define the following, for example:
. Whether you want to backflush activities.
. Whether you want to work with reporting points in make-to-stock REM.
. How you want to process errors which occur when backflushing.