This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes
▼
Monday, December 31, 2018
Sunday, December 30, 2018
Saturday, December 29, 2018
Friday, December 28, 2018
Question no 3609 : Plant Maintenance BOM relevancy
In SAP PM as at ECC6.0 EhP7, to be able to use the Material BOM in Plant Maintenance, the following must be TRUE of the BOM creation ?
(only one answer)
A) The BOM must be created with the relevant BOM usage.
B) The Material Master in the BOM Header must be created with Material Type "IBAU".
C) The Plant for the BOM must be a Maintenance Plant.
D) The Status of the BOM must be assigned with Plant Maintenance Relevance.
E) The Header BOM must be set with a "PM" Assembly Indicator.
.
Answer: A
Standard SAP BOM Usage "4" for PM.
(only one answer)
A) The BOM must be created with the relevant BOM usage.
B) The Material Master in the BOM Header must be created with Material Type "IBAU".
C) The Plant for the BOM must be a Maintenance Plant.
D) The Status of the BOM must be assigned with Plant Maintenance Relevance.
E) The Header BOM must be set with a "PM" Assembly Indicator.
.
Answer: A
Standard SAP BOM Usage "4" for PM.
Thursday, December 27, 2018
Wednesday, December 26, 2018
Tuesday, December 25, 2018
Question no 3608 : BOM and Routing
In SAP PP as at ECC6.0 EhP7, which of the following data structure are TRUE about PP Master Data ?
(more than one answers)
A) A BOM can be assigned to one or more Plants.
B) A Routing can be assigned to one or more Plants.
C) A Routing can be assigned to one or more Materials for the same Plant.
D) A BOM can be created without a Material and later assigned to one or more Materials.
E) A BOM can be created without a Plant and later assigned to one or more Plants.
.
Answer: A, C, E
A, E) When a BOM is created without a Plant, it saved as a Group BOM, but to use it, you must then later assigned it to one or more Plants.
B) A Routing is created specifically for a Plant.
C) A Routing can be created without a Plant but later assigned to one or more materials.
D) In CS01, minimum data is Material, Usage, and Date.
(more than one answers)
A) A BOM can be assigned to one or more Plants.
B) A Routing can be assigned to one or more Plants.
C) A Routing can be assigned to one or more Materials for the same Plant.
D) A BOM can be created without a Material and later assigned to one or more Materials.
E) A BOM can be created without a Plant and later assigned to one or more Plants.
.
Answer: A, C, E
A, E) When a BOM is created without a Plant, it saved as a Group BOM, but to use it, you must then later assigned it to one or more Plants.
B) A Routing is created specifically for a Plant.
C) A Routing can be created without a Plant but later assigned to one or more materials.
D) In CS01, minimum data is Material, Usage, and Date.
Monday, December 24, 2018
Sunday, December 23, 2018
Saturday, December 22, 2018
Friday, December 21, 2018
Question no 3607 : MM Physical Inventory
In SAP MM as at ECC6.0 EhP7, which of the following Physical Inventory can be carried out ?
(more than one answers)
A) Material created from Material Type with Quantity and with Value update.
B) Material created from Material Type with Quantity and without Value update.
C) Material created from Material Type without Quantity but with Value update.
D) Material created from Material Type without Quantity and without Value update.
E) All of the above.
.
Answer: A, B
As long as with Quantity update.
(more than one answers)
A) Material created from Material Type with Quantity and with Value update.
B) Material created from Material Type with Quantity and without Value update.
C) Material created from Material Type without Quantity but with Value update.
D) Material created from Material Type without Quantity and without Value update.
E) All of the above.
.
Answer: A, B
As long as with Quantity update.
Thursday, December 20, 2018
Tuesday, December 18, 2018
Sunday, December 16, 2018
Friday, December 14, 2018
Question no 3606 : QM Inspection Plan Structure
In SAP QM as at ECC6.0 EhP6, which of the following are TRUE about QM Inspection Plan ?
(more than one answers)
A) one or more Materials can be assigned to an Inspection Plan.
B) Inspection Plan can be assigned to Material + Vendor.
C) Inspection Plan can be both internal and external number range for Group no.
D) An Inspection Plan can be assigned to one or more Plants.
E) An Inspection Plan can be assigned to one or more Equipments.
.
Answer: A, B, C
A, B) An Inspection Plan can be assigned to Material or combined Material and Vendor or combined Material and Customer, and one or more of such can be assigned to an Inspection Plan.
C) OQ62 for number range (both internal and/or external are possible)
D) Each Group+Counter only for one Plant
E) at the version mentioned, not possible to assign Inspection Plan to EQ or FL.
(more than one answers)
A) one or more Materials can be assigned to an Inspection Plan.
B) Inspection Plan can be assigned to Material + Vendor.
C) Inspection Plan can be both internal and external number range for Group no.
D) An Inspection Plan can be assigned to one or more Plants.
E) An Inspection Plan can be assigned to one or more Equipments.
.
Answer: A, B, C
A, B) An Inspection Plan can be assigned to Material or combined Material and Vendor or combined Material and Customer, and one or more of such can be assigned to an Inspection Plan.
C) OQ62 for number range (both internal and/or external are possible)
D) Each Group+Counter only for one Plant
E) at the version mentioned, not possible to assign Inspection Plan to EQ or FL.
Thursday, December 13, 2018
Wednesday, December 12, 2018
Tuesday, December 11, 2018
Monday, December 10, 2018
Question no 3605 : Hierarchy Task List Structure
In SAP PM as at ECC6.0 EhP7, the following are correct about Hierarchy Task List Structure EXCEPT one ?
(only one answer)
A) You can create a General Hierarchy Task List, but not Equipment or Functional Location Hierarchy Task List.
B) The Equipment Hierarchy Task List can be created and assigned to one or more Equipments.
C) The Functional Location Hierarchy Task List can be created and assigned to one or more Functional Locations.
D) The Number Range for EQ and FL Hierarchy Task List can have both internal and external Number Range.
E) A Strategy cannot be assigned to a Hierarchy Task List.
.
Answer: E
A) You can create General, EQ, or FL Hierarchy Task List (with A, E, T Task List Type indicator).
B, C) Both EQ and FL Hierarchy Task List (as at the version mentioned) can only be relevant or assigned to one EQ or one FL.
D) The same number range concept applies to General, EQ, or FL Task List as to the Hierarchy Task List. Which means the EQ and FL and Hierarchy EQ and Hierarchy FL Task List can only have internal number range for the Group number.
E) The Header of the Hierarchy Task List contain: Group number, Counter, Planning Plant, Usage, Status, Short Text, External Identification, Change Number, and Date.
(only one answer)
A) You can create a General Hierarchy Task List, but not Equipment or Functional Location Hierarchy Task List.
B) The Equipment Hierarchy Task List can be created and assigned to one or more Equipments.
C) The Functional Location Hierarchy Task List can be created and assigned to one or more Functional Locations.
D) The Number Range for EQ and FL Hierarchy Task List can have both internal and external Number Range.
E) A Strategy cannot be assigned to a Hierarchy Task List.
.
Answer: E
A) You can create General, EQ, or FL Hierarchy Task List (with A, E, T Task List Type indicator).
B, C) Both EQ and FL Hierarchy Task List (as at the version mentioned) can only be relevant or assigned to one EQ or one FL.
D) The same number range concept applies to General, EQ, or FL Task List as to the Hierarchy Task List. Which means the EQ and FL and Hierarchy EQ and Hierarchy FL Task List can only have internal number range for the Group number.
E) The Header of the Hierarchy Task List contain: Group number, Counter, Planning Plant, Usage, Status, Short Text, External Identification, Change Number, and Date.
Saturday, December 8, 2018
Friday, December 7, 2018
Question no 3604 : Hierarchy Task List Structure
In SAP PM as at ECC6.0 EhP6, which of the following about Hierarchy Task List are Correct ?
(more than one answers)
A) Hierarchy Task List Number Range is different from the General Task List Number Range.
B) Hierarchy Task List can be assigned to the Maintenance Notification.
C) Hierarchy Task List can be assigned to the Maintenance Item.
D) Hierarchy Task List has a header with Usage and Status.
E) Planning Plant is not necessary for Hierarchy Task List.
.
Answer: B, C, D
A) Number Range is shared
E) Planning Plant is necessary for FL, EQ, General, and Hierarchy Task List.
(more than one answers)
A) Hierarchy Task List Number Range is different from the General Task List Number Range.
B) Hierarchy Task List can be assigned to the Maintenance Notification.
C) Hierarchy Task List can be assigned to the Maintenance Item.
D) Hierarchy Task List has a header with Usage and Status.
E) Planning Plant is not necessary for Hierarchy Task List.
.
Answer: B, C, D
A) Number Range is shared
E) Planning Plant is necessary for FL, EQ, General, and Hierarchy Task List.
Thursday, December 6, 2018
Wednesday, December 5, 2018
Tuesday, December 4, 2018
Monday, December 3, 2018
Question no 3603 : Make-to-Stock Strategy
In SAP PP as at ECC6.0 EhP6, a customers production strategy is to produce based on the Forecast, Stocks is the property of Marketing department and therefore it is of no concern to Planning. The Planner further stated that Sales Orders will only be information and should not be included for Production Plan calculations.
Select an appropriate Strategy.
(only one answer)
A) Strategy 10.
B) Strategy 11.
C) Strategy 30.
D) Strategy 31.
E) Strategy 40.
.
Answer: B
Strategy 11 "Gross" Planning ignores both stocks and sales orders.
Select an appropriate Strategy.
(only one answer)
A) Strategy 10.
B) Strategy 11.
C) Strategy 30.
D) Strategy 31.
E) Strategy 40.
.
Answer: B
Strategy 11 "Gross" Planning ignores both stocks and sales orders.
Sunday, December 2, 2018
Friday, November 30, 2018
Thursday, November 29, 2018
Wednesday, November 28, 2018
Question no 3602 : Manufacturing Strategy
In SAP PP as at ECC6.0 EhP6, consider the following statement by the planner "The Final Assembly of some of the Products can only begin when the Customer Order arrives but the Lead Time for these Customer Orders are too short and Forecast is necessary for the rest of the Components with longer procurement lead times".
Which of the following Strategy would you recommend ?
(only one answer)
A) Strategy 10.
B) Strategy 20.
C) Strategy 30.
D) Strategy 40.
E) Strategy 50.
.
Answer: E
Strategy 50 Planning without Final Assembly
Which of the following Strategy would you recommend ?
(only one answer)
A) Strategy 10.
B) Strategy 20.
C) Strategy 30.
D) Strategy 40.
E) Strategy 50.
.
Answer: E
Strategy 50 Planning without Final Assembly
Tuesday, November 27, 2018
Sunday, November 25, 2018
Saturday, November 24, 2018
Question no 3602 : Event-Driven Production
In SAP PP as at ECC6.0 EhP6, if a manufacturing facility has the following characteristics:
. relatively constant rate of demand
. no need for MRP run
. use demand to drive supply flow through production
(only one answer)
A) Process Order.
B) Production Order.
C) Production Campaign.
D) Kanban.
E) Repetitive Manufacturing.
.
Answer: D
Kanban
. relatively constant rate of demand
. no need for MRP run
. use demand to drive supply flow through production
(only one answer)
A) Process Order.
B) Production Order.
C) Production Campaign.
D) Kanban.
E) Repetitive Manufacturing.
.
Answer: D
Kanban
Friday, November 23, 2018
Question no 3601 : Production Methods
In SAP PP as at ECC6.0 EhP6, if a manufacturing facility has the following characteristics:
. dedicated production line
. very high product stabilities
. reduce of goods movements to reduce costs
. high repetition of production schedule
Which of the following Production Methods would you recommend ?
(only one answer)
A) Process Order.
B) Production Order.
C) Production Campaign.
D) Kanban.
E) Repetitive Manufacturing.
.
Answer: E
PP-REM, Repetitive Manufacturing
. dedicated production line
. very high product stabilities
. reduce of goods movements to reduce costs
. high repetition of production schedule
Which of the following Production Methods would you recommend ?
(only one answer)
A) Process Order.
B) Production Order.
C) Production Campaign.
D) Kanban.
E) Repetitive Manufacturing.
.
Answer: E
PP-REM, Repetitive Manufacturing
Thursday, November 22, 2018
Wednesday, November 21, 2018
Tuesday, November 20, 2018
Question no 3600 : Defaulting Order Type in the Maintenance Item
In SAP PM as at ECC6.0 EhP6, which of the following are used to default the Order Type in the Maintenance Item ?
(only one answer)
A) Planning Plant.
B) Planning Plant + Planner Group.
C) Planner Group.
D) Planning Plant + Maint.Work Center.
E) Planning Plant + Planner Group + Maint.Work Center.
.
Answer: B
IMG - PM/CS - Maint/Service Processing - Maint/Service Order - Function and Setting for Order Type - Define Default Order Type for Maintenance Item
(only one answer)
A) Planning Plant.
B) Planning Plant + Planner Group.
C) Planner Group.
D) Planning Plant + Maint.Work Center.
E) Planning Plant + Planner Group + Maint.Work Center.
.
Answer: B
IMG - PM/CS - Maint/Service Processing - Maint/Service Order - Function and Setting for Order Type - Define Default Order Type for Maintenance Item
Sunday, November 18, 2018
Saturday, November 17, 2018
Question no 3599 : Maintenance Plan Structure
In SAP PM as at ECC6.0 EhP6, take the correct statements regarding Maintenance Plan.
(more than one answers)
A) All Maintenance Plan can have one or more Maintenance Items.
B) All Maintenance Items must be assigned with a Task List.
C) All Maintenance Items must be at least one Reference Object.
D) All Maintenance Plan must be saved with a Cycle Start date or Counter number.
E) All Maintenance Plan must have at least one Maintenance Item for scheduling.
.
Answer: D, E
A) Specifically IP40 Service Procurement can only have one Maintenance Item.
B) Task list is not mandatory in standard SAP.
C) Ref Object is not necessary in the Maintenance Item, but no default data means user must enter the rest of the data in the Maintenance Item.
D) When saving Maintenance Plan the first time, the system always prompt for the Cycle Start.
E) Without the Maintenance Item, there is nothing to schedule.
(more than one answers)
A) All Maintenance Plan can have one or more Maintenance Items.
B) All Maintenance Items must be assigned with a Task List.
C) All Maintenance Items must be at least one Reference Object.
D) All Maintenance Plan must be saved with a Cycle Start date or Counter number.
E) All Maintenance Plan must have at least one Maintenance Item for scheduling.
.
Answer: D, E
A) Specifically IP40 Service Procurement can only have one Maintenance Item.
B) Task list is not mandatory in standard SAP.
C) Ref Object is not necessary in the Maintenance Item, but no default data means user must enter the rest of the data in the Maintenance Item.
D) When saving Maintenance Plan the first time, the system always prompt for the Cycle Start.
E) Without the Maintenance Item, there is nothing to schedule.
Friday, November 16, 2018
Thursday, November 15, 2018
Tuesday, November 13, 2018
Monday, November 12, 2018
Question no 3598 : Call Object by Maintenance Plan Category
In SAP PM as at ECC6.0 EhP6, which of the following are possible Call Objects via Maintenance Plan Category ?
(more than one answers)
A) Maintenance/Service Notification.
B) Maintenance/Service Order.
C) Service Entry Sheet.
D) Inspection Notification.
E) Inspection Lot.
.
Answer: A, B, C, E
Calling Inspection Lot is a function of QM. (but it is still possible via the same MP Category configuration)
(more than one answers)
A) Maintenance/Service Notification.
B) Maintenance/Service Order.
C) Service Entry Sheet.
D) Inspection Notification.
E) Inspection Lot.
.
Answer: A, B, C, E
Calling Inspection Lot is a function of QM. (but it is still possible via the same MP Category configuration)
Saturday, November 10, 2018
Friday, November 9, 2018
Question no 3597 : Maintenance Plan Category
In SAP PM as at ECC6.0 EhP6, which of the following are configuration parameters possible via the Maintenance Plan Category ?
(more than one answers)
A) Maintenance Plan number range.
B) Maintenance Item number range.
C) Call Object.
D) Change Document.
E) Reference Object.
.
Answer: A, C, D, E
IMG - PM/CS - Maint.Plan/WorkCenter/TaskList - Maint.Plans - Set MP Category
(more than one answers)
A) Maintenance Plan number range.
B) Maintenance Item number range.
C) Call Object.
D) Change Document.
E) Reference Object.
.
Answer: A, C, D, E
IMG - PM/CS - Maint.Plan/WorkCenter/TaskList - Maint.Plans - Set MP Category
Thursday, November 8, 2018
Tuesday, November 6, 2018
Question no 3596 : Source List in Source Determination in MRP Run
In SAP PP and MM as at ECC6.0 EhP6, MRP run uses the Source List to determine which of the following in an MRP run ?
(more than one answers)
A) Production version.
B) Vendor.
C) Contract.
D) Quantity split.
E) All of the above.
Answer: B, C
ME01
However, Quota Arrangement will allow assignment of Production Version and Ratio for sources for splitting quantities at MRP run.
(more than one answers)
A) Production version.
B) Vendor.
C) Contract.
D) Quantity split.
E) All of the above.
Answer: B, C
ME01
However, Quota Arrangement will allow assignment of Production Version and Ratio for sources for splitting quantities at MRP run.
Monday, November 5, 2018
Sunday, November 4, 2018
Saturday, November 3, 2018
Question no 3595 : Quota Arrangement in Source Determination in MRP Run
In SAP PP and MM as at ECC6.0 EhP6, MRP run uses the Quota Arrangement to determine which of the following in an MRP run ?
(more than one answers)
A) Production version.
B) Vendor.
C) Supplying Plant.
D) Quantity split.
E) All of the above.
Answer: A, B, C, D, E
MEQ1
(more than one answers)
A) Production version.
B) Vendor.
C) Supplying Plant.
D) Quantity split.
E) All of the above.
Answer: A, B, C, D, E
MEQ1
Friday, November 2, 2018
Thursday, November 1, 2018
Wednesday, October 31, 2018
Monday, October 29, 2018
Saturday, October 27, 2018
Thursday, October 25, 2018
Sunday, October 21, 2018
Question no 3594 : A BOM created without a Plant
In SAP PP as at ECC6.0 EhP6, a BOM created without a Plant is called a _____________________ .
(only one answer)
A) Group BOM.
B) Headerless BOM.
C) Standard BOM.
D) Reference BOM.
E) Temporary BOM.
.
Answer: A
Group BOM
(only one answer)
A) Group BOM.
B) Headerless BOM.
C) Standard BOM.
D) Reference BOM.
E) Temporary BOM.
.
Answer: A
Group BOM
Friday, October 19, 2018
Wednesday, October 17, 2018
Monday, October 15, 2018
Question no 3593 : Create BOM without Plant
In SAP PP as at ECC6.0 EhP6, during the user acceptance test; for a new material master, the user enters the BOM initial screen with the Material and Usage only, then press ENTER without the Plant, for what happen next, what is your explanation to the user ?
(only one answer)
A) The system prompts a warning dialogue that indicates a BOM Group will be created.
B) The system prompts an error dialogue that a Plant entry is necessary.
C) The system prompts an error dialogue that indicates the BOM Usage is not applicable for creation without Plant.
D) The system prompts a warning dialogue that indicates the Plant should be entered in the BOM item screen but a Plant with still have to be enter later when saving the BOM.
E) The system prompts an error dialogue that indicates User is not authorized to create BOM without Plant.
.
Answer: A
Its a BOM Group feature where a Material BOM can be created without a Plant which subsequently can be allocated to one or more Planta to share the same BOM contents.
(only one answer)
A) The system prompts a warning dialogue that indicates a BOM Group will be created.
B) The system prompts an error dialogue that a Plant entry is necessary.
C) The system prompts an error dialogue that indicates the BOM Usage is not applicable for creation without Plant.
D) The system prompts a warning dialogue that indicates the Plant should be entered in the BOM item screen but a Plant with still have to be enter later when saving the BOM.
E) The system prompts an error dialogue that indicates User is not authorized to create BOM without Plant.
.
Answer: A
Its a BOM Group feature where a Material BOM can be created without a Plant which subsequently can be allocated to one or more Planta to share the same BOM contents.
Sunday, October 14, 2018
Saturday, October 13, 2018
Thursday, October 11, 2018
Wednesday, October 10, 2018
Question no 3592 : User Status in Production Orders
In SAP PP as at ECC6.0 EhP7, how is the User Status Profile assigned to be used in Production Orders ?
(only one answer)
A) Assign to the Order Type (Plant independent parameter).
B) Assign to the Order Type Plant dependent parameter.
C) Assign to the User via a Parameter ID.
D) Assign to the Order Type + Plant + Planner Group (Plant dependent parameter).
E) Assign to the Order Type + Planner Group.
.
Answer: A
OLPF
(only one answer)
A) Assign to the Order Type (Plant independent parameter).
B) Assign to the Order Type Plant dependent parameter.
C) Assign to the User via a Parameter ID.
D) Assign to the Order Type + Plant + Planner Group (Plant dependent parameter).
E) Assign to the Order Type + Planner Group.
.
Answer: A
OLPF
Tuesday, October 9, 2018
Question no 3591 : Organizational Units relevant for MRP Planning Runs
In SAP PP as at ECC6.0 EhP6, which of the following Organizational Units are valid and considered for MRP Planning for Planned Order creations ?
(more than one answers)
A) MRP Area.
B) Purchasing Organization.
C) Plant.
D) Company Code.
E) Purchasing Group.
.
Answer: A, C
A,C) MRP Area is assigned with Storage Location for MRP at MRP Area activated at MRP1 data view which will have to be considered for Planning Run at the MRP Area level. MRP activation is at the Plant level so as the MRP data views.
B,E) This is not required considering "Planned Order creations" in the statement although Purchasing Group will be required if MRP run was setup to generate Purchase Requisitions. (The Purchasing Group can be defaulted from MRP Plant Parameter T-Code OPPQ)
D) Company Code is only necessary when creating Purchase Orders and not relevant for Planning Runs.
(more than one answers)
A) MRP Area.
B) Purchasing Organization.
C) Plant.
D) Company Code.
E) Purchasing Group.
.
Answer: A, C
A,C) MRP Area is assigned with Storage Location for MRP at MRP Area activated at MRP1 data view which will have to be considered for Planning Run at the MRP Area level. MRP activation is at the Plant level so as the MRP data views.
B,E) This is not required considering "Planned Order creations" in the statement although Purchasing Group will be required if MRP run was setup to generate Purchase Requisitions. (The Purchasing Group can be defaulted from MRP Plant Parameter T-Code OPPQ)
D) Company Code is only necessary when creating Purchase Orders and not relevant for Planning Runs.
Saturday, October 6, 2018
Question no 3590 : P1, P2, P3, P4 MRP Types
In SAP PP as at ECC6.0 EhP6, in conducting the PP workshop, the user notice MRP Type delivered by SAP includes P1, P2, P3, P4, other than the standard PD, how would you response to the use of these variations of MRP Type to the curious user ?
(only one answer)
A) Treatment of New Demands within the time fence and how the New Procurement Proposal should be death with.
B) Different time fence periods.
C) How the different types of Stock Types are treated.
D) For MRP Type with User Exits.
E) Tell the user the P1, P2, P3, P4 are not important.
.
Answer: A
Basically 2 treatments for treatment of demands within the time fence:
. ignore and not create a suplly planned order to fulfill the new demand.
. create proposal outside the time fence.
(only one answer)
A) Treatment of New Demands within the time fence and how the New Procurement Proposal should be death with.
B) Different time fence periods.
C) How the different types of Stock Types are treated.
D) For MRP Type with User Exits.
E) Tell the user the P1, P2, P3, P4 are not important.
.
Answer: A
Basically 2 treatments for treatment of demands within the time fence:
. ignore and not create a suplly planned order to fulfill the new demand.
. create proposal outside the time fence.
Thursday, October 4, 2018
Wednesday, October 3, 2018
Tuesday, October 2, 2018
Monday, October 1, 2018
Question no 3589 : Roll forward in MRP Run
In SAP PP as at ECC6.0 EhP6, A user wants a rolling forward for a material with MRP type with firming type = 1, to be set up for a production material master. Rolling planning time fence means new planned orders which are firmed within a planning time fence, when an unforeseen production failure occurs, it can happen that such firmed planned orders are not being processed because time passes. What solution would you recommend to automatically delete these kinds of firmed planned orders?
(only one answer)
A) Roll forward period assign to the MRP Group.
B) Roll forward period assign to the MRP Type.
C) Roll forward period assign to the MRP Controller.
D) Roll forward period assign to the Material Type.
E) Roll forward period assign tot he Order Type.
.
Answer: A
Firmed planned orders are subject to normal firming logic; that means, the system does not delete them automatically during the planning run when they are no longer needed. You can, however, define a roll forward period. The system then deletes all firmed planned orders that lie before the roll forward period automatically. The master plan is thus updated.
The basic setup is the Roll forward period to be assigned to the MRP Group where it is then assign to the Material Master in the MRP 1 view.
(only one answer)
A) Roll forward period assign to the MRP Group.
B) Roll forward period assign to the MRP Type.
C) Roll forward period assign to the MRP Controller.
D) Roll forward period assign to the Material Type.
E) Roll forward period assign tot he Order Type.
.
Answer: A
Firmed planned orders are subject to normal firming logic; that means, the system does not delete them automatically during the planning run when they are no longer needed. You can, however, define a roll forward period. The system then deletes all firmed planned orders that lie before the roll forward period automatically. The master plan is thus updated.
The basic setup is the Roll forward period to be assigned to the MRP Group where it is then assign to the Material Master in the MRP 1 view.