Question no 3503 : Auto Generations in MM
In SAP MM as at ECC6.0 EhP6, which of the following cannot be Automatically generated ?
(only one answer)
A) Source List.
B) Purchasing Info Record.
C) Purchase Requisition.
D) Quota Arrangement.
E) Purchase Order.
.
Answer: D
A) Source List can be generated for the PIR, Contract, or SA.
B) PIR can be generated from the PO, Contract, or SA.
C) PR can be generated from an Order, or MRP run.
E) GR can auto generate a PO.
(only one answer)
A) Source List.
B) Purchasing Info Record.
C) Purchase Requisition.
D) Quota Arrangement.
E) Purchase Order.
.
Answer: D
A) Source List can be generated for the PIR, Contract, or SA.
B) PIR can be generated from the PO, Contract, or SA.
C) PR can be generated from an Order, or MRP run.
E) GR can auto generate a PO.
Friday, January 26, 2018
Question no 3502 : Client level data in Material Master
In SAP MM as at ECC6.0 EhP7, which of the following are Client level data in the Material Master ?
(more than one answers)
A) Base Unit of Measure.
B) Material Group.
C) Old Material Number.
D) Division.
E) Purchasing Value Key.
.
Answer: A, B, C, D, E
They are all at the client level. Basic data view at client level contains the Base UOM, Material Group, Old Material Number, and Division. But when accessing the Purchasing data view without entering the Plant, you can see that the Purchasing Value Key exist at the Client level data.
Conclusion, when accessing the material data views using a Plant may mislead you to think that all fields in that plant data view are at the Plant level ! But when you access the same data view without entering the Plant, you can see some fields appear at the client level !
(more than one answers)
A) Base Unit of Measure.
B) Material Group.
C) Old Material Number.
D) Division.
E) Purchasing Value Key.
.
Answer: A, B, C, D, E
They are all at the client level. Basic data view at client level contains the Base UOM, Material Group, Old Material Number, and Division. But when accessing the Purchasing data view without entering the Plant, you can see that the Purchasing Value Key exist at the Client level data.
Conclusion, when accessing the material data views using a Plant may mislead you to think that all fields in that plant data view are at the Plant level ! But when you access the same data view without entering the Plant, you can see some fields appear at the client level !
Thursday, January 25, 2018
Question no 3501 : Purchase Requisition in Maintenance
In SAP PM as at ECC6.0 EhP6, Non-Stock Procurement initiated from a Maintenance Order has the following characteristics ?
(more than one answers)
A) The Purchase Requisition procurement data from the MO cannot be changed using ME52N.
B) When the PR in converted to PO, PO data also cannot be changed using ME22N.
C) When changing the order quantity in the MO, the non-stock quantity in the PR will also be changed only before the Order is Released.
D) When changing the order quantity in the MO, the non-stock quantity in the PR will also be changed after the MO is Released.
E) When changing the order quantity in the MO, the non-stock quantity in the PR will also be changed after the Goods Receipt of the previous PO has been completed.
.
Answer: A, C, D, E,
A) The PR fields are all grayed out even accessing it in ME52N (except the PR Header Text and Item Text which still cannot be entered).
B) Changes to the PO data is possible.
C, D, E) Non-stock PR quantity can be changed by the changes of the MO quantity before Release, After Release of the MO as well as after the associated non-stock PO has been received.
For example:
MO non-stock qty is 1, PR is 1, PO is 1, GR is 1
MO non-stock qty change to 4, PR qty will change to 4, another PO can be converted to 3, GR is 3
(more than one answers)
A) The Purchase Requisition procurement data from the MO cannot be changed using ME52N.
B) When the PR in converted to PO, PO data also cannot be changed using ME22N.
C) When changing the order quantity in the MO, the non-stock quantity in the PR will also be changed only before the Order is Released.
D) When changing the order quantity in the MO, the non-stock quantity in the PR will also be changed after the MO is Released.
E) When changing the order quantity in the MO, the non-stock quantity in the PR will also be changed after the Goods Receipt of the previous PO has been completed.
.
Answer: A, C, D, E,
A) The PR fields are all grayed out even accessing it in ME52N (except the PR Header Text and Item Text which still cannot be entered).
B) Changes to the PO data is possible.
C, D, E) Non-stock PR quantity can be changed by the changes of the MO quantity before Release, After Release of the MO as well as after the associated non-stock PO has been received.
For example:
MO non-stock qty is 1, PR is 1, PO is 1, GR is 1
MO non-stock qty change to 4, PR qty will change to 4, another PO can be converted to 3, GR is 3
Wednesday, January 24, 2018
Question no 3500 : Maintenance Plan Scheduling
In SAP PM as at ECC6.0 EhP6, which of the following are Scheduling Indicator appropriate for the following scheduling scenario ?
Today's date: 24/01/2018 Due for the current monthly cycle maintenance
Next planned date: 24/02/2018 which is always on the 24th of the month (next cycle)
(only one answer)
A) Time.
B) Time - Key Date.
C) Time - Factory Calendar.
D) Time - Fixed Cycle.
E) Exact Cycle.
.
Answer: B
Only 3 scheduling indicators:
For scheduling, one month is always 30 days
1) Time (If Today's date scheduling called an Due Maintenance for 24/01/2018, next cycle is 30 days which is 23/02/2018.
2) Time-Key Date (If Today's date scheduling called an Due Maintenance is 24/01/2018, ext cycle is 24/01/2018 which is every 24th.
3) Factory Calendar (If Today's date scheduling called an Due Maintenance is 24/01/2018, next cycle is counting 30 days from 24/01/2018 depending on the working days on the Factory Calendar)
Tuesday, January 23, 2018
Question no 3499 : Factory Calendar in PM
In SAP PM as at ECC6.0 EhP6, the Factory Calendar can be assign to the following in PM EXCEPT ?
(only one answer)
A) Planning Plant.
B) Work Center.
C) Maintenance Order.
D) Maintenance Plan.
E) Maintenance Notification.
.
Answer: E
(only one answer)
A) Planning Plant.
B) Work Center.
C) Maintenance Order.
D) Maintenance Plan.
E) Maintenance Notification.
.
Answer: E
Monday, January 22, 2018
Question no 3498 : Movement Types in Plant Maintenance
In SAP PM as at ECC6.0 EhP6, choose the correct statements about Movement Types in Plant Maintenance ?
(more than on answers)
A) Only one set of movement type is allowed for each Order Type (Plant Independent)
B) Only one set of movement type is allowed for each Order Type plus Planning Plant combination.
C) Only one set of movement type is allowed for all Order Types independent of Plants.
D) Only one set of movement type is allowed for each Planning Plant independent of Order Types.
E) Only one set of movement type is allowed for each User.
.
Answer: C
IMG - PM/CS - Maint.Serv Processing - Maint.Serv Orders - General Data - Define Movement Type for Reservations... check IW01 package
(more than on answers)
A) Only one set of movement type is allowed for each Order Type (Plant Independent)
B) Only one set of movement type is allowed for each Order Type plus Planning Plant combination.
C) Only one set of movement type is allowed for all Order Types independent of Plants.
D) Only one set of movement type is allowed for each Planning Plant independent of Order Types.
E) Only one set of movement type is allowed for each User.
.
Answer: C
IMG - PM/CS - Maint.Serv Processing - Maint.Serv Orders - General Data - Define Movement Type for Reservations... check IW01 package
Sunday, January 21, 2018
Question no 3497 : Putaway Strategies
In SAP WMS as at ECC6.0 EhP6, which of the following is not a valid WMS Strategies for Putaway ?
(only one answer)
A) Strategy for Fixed Bin.
B) Strategy for FIFO.
C) Strategy for Pallets.
D) Strategy for Bulk Storage.
E) Strategy for Next Empty Bin.
.
Answer: B
FIFO is a Removal Strategy.
(only one answer)
A) Strategy for Fixed Bin.
B) Strategy for FIFO.
C) Strategy for Pallets.
D) Strategy for Bulk Storage.
E) Strategy for Next Empty Bin.
.
Answer: B
FIFO is a Removal Strategy.
Friday, January 19, 2018
Question no 3496 : Number Ranges in WMS
In SAP WMS as at ECC6.0 EhP6, which of the following are Number Ranges to be created for SAP WMS ?
(more than one answers)
A) Transfer Requirements.
B) Transfer Orders.
C) Quants.
D) Post Change Notices.
E) Storage Bins.
Answer: A, B, C, D
OMLW
The following are Number Ranges in WMS
(more than one answers)
A) Transfer Requirements.
B) Transfer Orders.
C) Quants.
D) Post Change Notices.
E) Storage Bins.
Answer: A, B, C, D
OMLW
The following are Number Ranges in WMS
- Transfer Requirements.
- Transfer Orders.
- Quants.
- Post Change Notices.
- Group for Printing.
- Storage Unit Number.
Thursday, January 18, 2018
Question no 3495 : Indicators for Search techniques in WMS
In SAP WMS as at ECC6.0 EhP6, which of the following usage descriptions are correct ?
(more than one answers)
A) Storage Type Indicators are for Stock Removal and Stock Placement Storage Type Search.
B) Storage Section Indicators are for Storage Section Search.
C) Storage Bin Indicators are for Storage Bin Search.
D) Special Movement Indicators are for Storage Type Search.
E) Sort Sequences are used for Storage Bin Sorting.
.
Answer: A, B, E
C) There are no Storage Bin Indicators, Bin Types are used instead.
D) Special Movement Indicators are for WM Movement Type Determination.
E) Sort Sequences allows you to write to write a Sort-ID to the Storage Bin and the Sorting result is used for Placement and Removal Strategy at the Storage Bin level.
(more than one answers)
A) Storage Type Indicators are for Stock Removal and Stock Placement Storage Type Search.
B) Storage Section Indicators are for Storage Section Search.
C) Storage Bin Indicators are for Storage Bin Search.
D) Special Movement Indicators are for Storage Type Search.
E) Sort Sequences are used for Storage Bin Sorting.
.
Answer: A, B, E
C) There are no Storage Bin Indicators, Bin Types are used instead.
D) Special Movement Indicators are for WM Movement Type Determination.
E) Sort Sequences allows you to write to write a Sort-ID to the Storage Bin and the Sorting result is used for Placement and Removal Strategy at the Storage Bin level.
Wednesday, January 17, 2018
Question no 3494 : Storage Bin creation
In SAP WMS as at ECC6.0 EhP6, which of the following are Mandatory when Creating a Storage Bin in SAP WMS ?
(more than one answer)
A) Warehouse.
B) Storage Section.
C) Picking Area.
D) Bin Type.
E) Fire-Containment Section.
.
(more than one answer)
A) Warehouse.
B) Storage Section.
C) Picking Area.
D) Bin Type.
E) Fire-Containment Section.
.
Monday, January 15, 2018
Question no 3493 : Storage Types in WMS
In SAP WMS as at ECC6.0 EhP6, which of the following are correct depiction of Storage Types in SAP WMS structuring ?
(more than one answers)
A) A Storage Type cannot have 2 similar Bin Codes.
B) A Storage Type can have 1 or more Storage Sections.
C) A Storage Type can be assigned to 1 or more Warehouse.
D) A Storage Type can be set without Stock Placement or Removal Strategies.
E) A Storage Type can have one or more Stock Placement Strategies.
.
Answer: A, B, D
A) Bin Codes are unique only to a Storage Type, but the same bin code can be created for another Storage Type.
B) Storage Sections of 1 minimum for each Storage Type as Storage Bins cannot be created with a Storage Section.
C) A Storage Type is always created for a Warehouse. The Same Storage Type code can used for creating it with another Warehouse number.
D) For example, Storage Type 999 do not have any Strategies.
E) Each Storage Type can have only exactly one Stock Placement and Removal Strategies.
(more than one answers)
A) A Storage Type cannot have 2 similar Bin Codes.
B) A Storage Type can have 1 or more Storage Sections.
C) A Storage Type can be assigned to 1 or more Warehouse.
D) A Storage Type can be set without Stock Placement or Removal Strategies.
E) A Storage Type can have one or more Stock Placement Strategies.
.
Answer: A, B, D
A) Bin Codes are unique only to a Storage Type, but the same bin code can be created for another Storage Type.
B) Storage Sections of 1 minimum for each Storage Type as Storage Bins cannot be created with a Storage Section.
C) A Storage Type is always created for a Warehouse. The Same Storage Type code can used for creating it with another Warehouse number.
D) For example, Storage Type 999 do not have any Strategies.
E) Each Storage Type can have only exactly one Stock Placement and Removal Strategies.
Question no 3492 : Bulk Material in Maintenance Order
In SAP PM as at ECC6.0 EhP6, the "Bulk Material" indicator in the Component detail within the Maintenance Order has the following characteristics ?
(more than one answers)
A) It does not allow Costing Relevancy.
B) Movement Allowed Indicator is not automatically flag upon Release of the Order.
C) Goods Movement not possible for this kind of Material.
D) Backflushing and "Bulk Material" settings are Mutually Exclusive.
E) You can default a Material is "Bulk Material" from the BOM item detail.
.
Answer: A, B, C, D, E
All of the above are characteristics of Bulk Material. There are specific uses of Bulk Material in the Manufacturing environment. For Plant Maintenance, I am still thinking about its practical applications.
(more than one answers)
A) It does not allow Costing Relevancy.
B) Movement Allowed Indicator is not automatically flag upon Release of the Order.
C) Goods Movement not possible for this kind of Material.
D) Backflushing and "Bulk Material" settings are Mutually Exclusive.
E) You can default a Material is "Bulk Material" from the BOM item detail.
.
Answer: A, B, C, D, E
All of the above are characteristics of Bulk Material. There are specific uses of Bulk Material in the Manufacturing environment. For Plant Maintenance, I am still thinking about its practical applications.
Sunday, January 14, 2018
Question no 3491 : Purchasing Requisition Document Type
In SAP MM as at ECC6.0 EhP6, which of the following are configurable for the Purchase Requisition Document Type ?
(more than one answers)
A) Combination of Item Category and Account Assignment for the PR Doc Type.
B) Item Categories for the PR Doc Type.
C) Account Assignments for the PR Doc Type.
D) Combination of Subsequent Doc Type and Item Category for the PR Doc type and Item Category.
E) Combination of Subsequent Doc Type+Item Category+Account Assignment for the PR Doc Type+Item Category+Account Assignment.
.
Answer: B, D
IMG - MM - Purchasing - PR - Define Doc Types
Thursday, January 11, 2018
Question no 3490 : Copy Text Rules for Purchase Requisition
In SAP MM as at ECC6.0 EhP6, which of the Objects can be included in Copy Text Rules for Purchase Requisition Document ?
(more than one answers)
A) Material Master.
B) Vendor.
C) Purchasing Info Record.
D) Purchase Requisition.
E) Network.
.
(more than one answers)
A) Material Master.
B) Vendor.
C) Purchasing Info Record.
D) Purchase Requisition.
E) Network.
.
Question no 3489 : Exception Messages in MRP Run
In SAP PP, MM as at ECC6.0 EhP6, which of the following are configurable for Exception Messages ?
(more than one answers)
A) New Exception Messages can be configured.
B) Exception Messages short text can be changed.
C) There can be de-activated.
D) MRP List creation can be dependent on Exception Messages.
E) They can be Re-Grouped.
.
Answer: B, C, D, E
IMG - PP - CBP - Evaluation - Exception Messages - Define and Group Execution Messages
IMG - PP - MRP - Evaluation - Exception Messages - Define and Group Execution Messages
Wednesday, January 10, 2018
Question no 3488 : Scope of Planning
In SAP MM, PP as at ECC6.0 EhP6, Scope of Planning allows you to setup which of the following data sequence of planning for MRP run at the Plant level ?
(only one answer)
A) Plant + MRP Area.
B) Plant + Storage Location.
C) Plant + MRP Type.
D) Plant + MRP Group.
E) Plant + Material Group.
.
(only one answer)
A) Plant + MRP Area.
B) Plant + Storage Location.
C) Plant + MRP Type.
D) Plant + MRP Group.
E) Plant + Material Group.
.
Tuesday, January 9, 2018
Question no 3487 : MRP Group Default
In SAP PP, MM as at ECC6.0 EhP6, which of the default parameters is/are used to default the MRP Group in the Material Master MRP1 data view ?
(only one answer)
A) Material Type + Plant.
B) MRP Type + Plant.
C) Material Type + MRP Type + Plant.
D) Material Type.
E) Plant.
.
Answer: A
IMG - MM - CBP - MRP Groups - Define MRP Group for Each Material Type
IMG - PP - MRP - MRP Groups - Define MRP Group for Each Material Type
(only one answer)
A) Material Type + Plant.
B) MRP Type + Plant.
C) Material Type + MRP Type + Plant.
D) Material Type.
E) Plant.
.
Answer: A
IMG - MM - CBP - MRP Groups - Define MRP Group for Each Material Type
IMG - PP - MRP - MRP Groups - Define MRP Group for Each Material Type
Monday, January 8, 2018
Question no 3486 : MRP Plant Parameters Number Ranges
In SAP MM,PP as at ECC6.0 EhP6, which for the number Objects for Number Ranges can be set for MRP Plant Parameter ?
(more than one answers)
A) Purchase Requisitions.
B) Planned Orders.
C) MRP List.
D) Dependent Requirements.
E) Total Requirements.
.
Answer: A, B, C, D, E
OMI2
(more than one answers)
A) Purchase Requisitions.
B) Planned Orders.
C) MRP List.
D) Dependent Requirements.
E) Total Requirements.
.
Answer: A, B, C, D, E
OMI2
Sunday, January 7, 2018
Question no 3485 : Forecasting Data View
In SAP MM as at ECC6.0 EhP6, which of the following can cause the Forecasting Data View to be Mandatory when creating the Material Master ?
(only one answer)
A) MRP Type.
B) Plant Parameter.
C) MRP Group Parameter.
D) User.
E) MRP Strategy.
.
Answer: A
IMG - MM - CBP - Master Data - Check MRP Type
(only one answer)
A) MRP Type.
B) Plant Parameter.
C) MRP Group Parameter.
D) User.
E) MRP Strategy.
.
Answer: A
IMG - MM - CBP - Master Data - Check MRP Type
Saturday, January 6, 2018
Question no 3484 : Exclude or Include Reservations during MRP Run
In SAP MM Consumption Based Planning as at ECC6.0 EhP7, which of the following parameter is used to control the exclusion or inclusion of Reservations from the MRP Run ?
A) Plant Parameter.
B) MRP Group Parameter.
C) MRP Type.
D) MRP Profile.
E) Planning File Entry.
.
Answer: C
IMG - MM - CBP - Master Data - Check MRP Types
review MRP Type "VB", review "Include ext. requirements" field.
Wednesday, January 3, 2018
Tuesday, January 2, 2018
Question no 3483 : Manual Reservations on MO Availability Check
In SAP PM as at ECC6.0 EhP6, which of the following configuration parameters allows you to exclude Manual Reservations from Maintenance Order Availability Check ?
(only one answer)
A) Scope of Check.
B) Availability Check Group.
C) Availability Check Rule.
D) Inspection Control.
E) Order Type.
.
Answer: A
OPJJ
(only one answer)
A) Scope of Check.
B) Availability Check Group.
C) Availability Check Rule.
D) Inspection Control.
E) Order Type.
.
Answer: A
OPJJ
Monday, January 1, 2018
Question no 3482 : At Maintenance Order TECO
In SAP PM as at ECC6.0 EhP7, which of the following functions are automatically executed at the point of Maintenance Order TECO ?
(more than one answers)
A) Work Center Capacity are released.
B) Purchase Requisitions items are flag with deletion indicator.
C) Purchase Orders items are flag with deletion indicator.
D) Reservations are Set with Deletion Indicator.
E) Reservations are Set with Finished Issued Indicator.
.
(more than one answers)
A) Work Center Capacity are released.
B) Purchase Requisitions items are flag with deletion indicator.
C) Purchase Orders items are flag with deletion indicator.
D) Reservations are Set with Deletion Indicator.
E) Reservations are Set with Finished Issued Indicator.
.