Question no 1683: Default Order Type in Delivery Type

In SAP SD/LE ECC6.0, the "Default Order Type" found in the Delivery Type configuration is used for what purpose ?

(only one answer)

A)    Control criteria used in-case of Delivery Type without Order Reference.
B)    Control criteria used in-case of Delivery Type with Order Reference.
C)    Control criteria used in-case of Delivery Type for Non-Sales Order based Reference.
D)    Control criteria used in-case when the Sales Order header data has in-complete information.
E)    Control criteria used in-case of a Purchase Order is referenced.

Saturday, September 29, 2012

Question no 1682: Batch Determination for Inventory Management

In SAP MM ECC6.0, the batch determination procedure for Inventory Management application is assigned to which of the following ?

(more then one answers)

A)    Document Type and Movement Type.
B)    Document Type, Plant, and Movement Type.
C)    Event type, Plant, and Movement Type.
D)    Movement Type.
E)    Movement Type and Plant.
.

Friday, September 28, 2012

Question no 1681: Shipping Point

In SAP SD/LE ECC6.0, which of the followings are CORRECT about the Shipping Point ?

(more then one answers)

A)   The Shipping Point is the top level of Organizational Unit for Shipping.
B)    A Shipping Point can be allocated to several Plants.
C)    A Shipping Point can be divided into several Loading Points.
D)    A Delivery is always limited from exactly one Shipping Point.
E)    A Shipping Point has an address.
.

Thursday, September 27, 2012

Question no 1680: Delivery Type for Inbound Delivery

In SAP SD/LE ECC6.0, Standard SAP provides a list of Standard Delivery Types, which of the following delivery type is provided for Inbound Delivery ?

(only one answer)

A)    EL.
B)    LB.
C)    LF.
D)    LO.
E)    LP.
.

Wednesday, September 26, 2012

Question no 1679: Delivery Types

In SAP SD/LE ECC6.0, the function of the Delivery Type controls which of the following ?

(more then one answers)

A)    Number assignment of the Delivery Order.
B)    Message Output.
C)    Route Determination.
D)    Transportation Relevance.
E)    Delivery Split by Warehouse Number.
.

Tuesday, September 25, 2012

Question no 1678: Shipping Point Determination

In SAP SD/LE ECC6.0, the Shipping Point can be determined for each item in the Sales Order, what are the factors which determines the Shipping Point ?

(more then one answers)

A)   Shipping Condition of the Sold-to-Party.
B)   Shipping Condition of the Ship-to-Party.
C)   Loading Group of the Material Master at the Sales/Plant view.
D)   Loading Group of the Material Master at the Sales Area view.
E)   The Delivery Plant.
.

Monday, September 24, 2012

Question no 1677: Inbound deliveries

In SAP SD/LE ECC6.0, a Shipping Point may also be set as a _______________, which means it can also be used for inbound deliveries.

(only one answer)

A)    Loading Point.
B)    Incoming Point.
C)    Goods Receipt Area.
D)    Goods Receipt Point.
E)    Inbound Point.

Sunday, September 23, 2012

Question no 1675: Shipping Processing

In SAP SD/LE as at ECC6.0, which of the following specific activities can you complete within the shipping process ?

(more then one answers)

A)    Picking.
B)    Packing.
C)    Goods issue.
D)    Printing and distribution of shipping documents.
E)    Sales pricing condition confirmation and approval.
.

Saturday, September 22, 2012

Question no 1676: Shipping Point

In SAP SD/LE ECC6.0, which of the following statements are TRUE about the Shipping Point ?

(more then one answers)

A)    A Shipping Point is determined in the Order at the header level.
B)    A Shipping Point is determined in the Order at the item level.
C)    A Shipping Point can processed the outbound deliveries of only one Plant.
D)    A Shipping Point can processed the outbound deliveries of several Plants.
E)    The Shipping Point assigned to the Plant must first be assigned to the Company code.
.

Friday, September 21, 2012

Question no 1675: Shipping Monitoring

In SAP SD/LE ECC6.0, the main organizational object for monitoring of shipping due dates, creating and managing the delivery is ___________________ .

(only one answer)

A)     Transportation Planning Point.
B)     Sales Area.
C)     Shipping Point.
D)     Plant.
E)     Delivery Plant.
.

Thursday, September 20, 2012

Question no 1674: Combining Outbound Deliveries

In SAP SD/LE as at ECC6.0, when several Outbound Deliveries are grouped together, for example several outbound deliveries are loaded into a truck and the truck then delivers to several shipping points and several ship-to-parties along a route, this document is called ________________ .

(only one answer)

A)    Shipment document.
B)    Delivery document.
C)    Route document.
D)    Collective Outbound Delivery document.
E)    Combined Delivery document.
.

Wednesday, September 19, 2012

Question no 1673: Processes of Delivery

In SAP SD/LE as at ECC6.0, the different processes of delivery such as delivery scenario for Stock Transport Order, sub-contract PO, return to vendor etc are modeled using _________________ .

(only one answer)

A)  Account Assignment.
B)  Shipping Point.
C)  Delivery Type.
D)  Route.
E)  Plant.
.

Tuesday, September 18, 2012

Question no 1672: Applications Areas for the Delivery Process

In SAP SD/LE as at ECC6.0, which of the following areas of applications are supported using the Delivery Processes ?

(more then one answers)

A)    Stock transport order between plants.
B)    Delivery of Sub-contracting Purchase order items to Vendors.
C)    Returns to vendor via Purchase Orders.
D)    In-bound delivery for Purchase Orders.
E)    Out-bound delivery for Sales Orders.
.

Monday, September 17, 2012

Question no 1671: The Delivery Document

In SAP SD or LE as at ECC6.0, the Delivery Document header contains unique information of which of the following for the entire Delivery Document ?

(more then one answers)

A)   Ship to Party.
B)   Shipping Point.
C)   Item Category.
D)   Route.
E)   Material.
.

Sunday, September 16, 2012

Question no 1670: Logistics Execution

In SAP LE as at ECC6.0, the processes supported by LE (Logistics Execution) includes which of the following ?

(more then one answers)

A)     Warehouse Management.
B)     Inventory Management.
C)     Shipping.
D)     Transportation.
E)     Batch Management.
.

Saturday, September 15, 2012

Question no 1669: 3 decimal uom

In SAP PP ECC6.0, if a raw material input quantity is 0.24689 gram to produce 1 kg of a finished product. The raw material was setup with base unit of measure as gram and purchasing unit of measure as kg. What is your recommended setup of the raw material in the BOM as SAP only allows 3 decimal places ?

(only one answer)

A)    change the base uom to milligram and purchasing uom to gram.
B)    retain the base uom as gram and change the purchasing uom to gram.
C)    increase the base quantity in the BOM header to 100 kg or more.
D)    change the uom of the raw material in the BOM to milligram.
E)    round up the quantity to 0.247 gram.

Friday, September 14, 2012

Question no 1668: Backflushing

In SAP PP ECC6.0, Backflushing can be setup using which of the following method ?

(more the one answers)

A)   Material master MRP2 view.
B)   Work center.
C)   BOM item detail.
D)   Component assignment to operation in the Routing.
D)   Routing header.
.

Wednesday, September 12, 2012

Question no 1667: Controlling Product Cost Estimate

In SAP PP/CO ECC6.0, in order to control a material for product cost estimate calculation, especially for new product development until mass production, which of the following is your recommendation ?

(only one answer)

A)     Use the correct material type.
B)     Do not create the Bills of Material and Routing until mass production begins.
C)     Do not create the Costing view of the material master until mass production begins.
D)     Assign an appropriate material status to the material master.
E)     Set the item status in the BOM to control the "costing relevancy".
.

Tuesday, September 11, 2012

Question no 1666: MRP mechanics

In SAP PP ECC6.0, the following is valid for a successful material planning run ?

(more then one answers)

A)   An accounting data view is not necessary.
B)   A purchasing data view is mandatory.
C)   The material's MRP3 view must be set with availability check group.
D)   A purchasing info record is required during the MRP un.
E)   MRP3 and MRP4 data views parameters are not necessary.
.

Sunday, September 9, 2012

Question no 1665: Bill of Material

In SAP ECC6.0, the Bill of Material can be created in the following manners except ?

(more then one answers)

A)    create a BOM without material and assign to several materials.
B)    create a BOM without plant and assign to several plants.
C)    create a BOM for a material group with inclusion indicator.
D)    create a BOM without material and plant, then assign to several materials and several plants.
E)    create a BOM as a Variant BOM of other materials.
.

Saturday, September 8, 2012

Question no 1664: Lot Sizing

In SAP PP ECC6.0, a planner wants to implement a fixed-lot sizing rule but wish the final lot calculation to be without remnant quantities,
for example:
current stock : 0
PIR in period n+1 : 500, two fixed lot size of 400
PIR in period n+2 : 500, one fixed lot size of 400
PIR in period n+3 : 500, final lot size of 300
total demand and supply is 1500, no remnant quantities.

Which of the following would you recommend ?

A)    switch to "EX" lot sizing rule.
B)    manually change the MRP calculated last lot size to 300.
C)    configure MRP run to ignore the final PIR, and manually create the PR.
D)    set the indicator "last lot exact" in the fixed lot sizing rule.
E)    use consumption based planning.
.

Thursday, September 6, 2012

Question no 1663: PP Work centers

In SAP ECC6.0 PP, which of the following statements are true about PP work centers ?

(more then one answers)

A)    More then one PP work center can be assigned to one cost center.
B)    The formulas for capacity calculation and scheduling need to be the same.
C)    More then one capacity categories are allowed for each PP work center.
D)    Implementing shift sequence in a PP work center is optional.
E)    A PP work center must use the same factory calendar from the Plant the work center is created.
.

Wednesday, September 5, 2012

Question no 1662: Manufacturing method

In SAP ECC6.0, when a manufacturing scenario is in mass production, schedule for a product is of a longer run and product with less complexity, which of the following SAP manufacturing techniques would you recommend most suitable ?

(only one answer)

A)    Mass production.
B)    Process order based.
C)    Production order based.
D)    Repetitive manufacturing.
E)    Bulk manufacturing.
.

Tuesday, September 4, 2012

Question no 1661: Phantom assembly

In SAP PP ECC6.0, the phantom assembly can be achieved via which of the following ?

(more then one answers)

A)   special procurement key in the material master.
B)   create a bill of material without a plant using a Phantom BOM Usage.
C)   using an appropriate item category in the BOM item.
D)   special procurement key in the BOM item detail.
E)   as long as material master is created without MRP view, it is Phantom Material.
.

Monday, September 3, 2012

Question no 1660: PP BOM

In SAP as at ECC6.0, if you create a BOM without reference to a Plant in PP, it is called a ________ .

(only one answer)

A)    Simple BOM.
B)    Material-less BOM.
C)    Non-plant BOM.
D)    Group BOM.
E)    Plant-less BOM.
.

Sunday, September 2, 2012

Question no 1659: What PP Strategy

In SAP PP, which of the following PP strategies allow MRP run to recognize the Planned Independent Requirements ?

(more then one answers)

A)   Strategy 10.
B)   Strategy 20.
C)   Strategy 30.
D)   Strategy 40.
E)   Strategy 50.
.

Saturday, September 1, 2012

Question no 1658: What PP Strategy

In SAP PP ECC6.0, choose a PP strategy that allows you to perform MRP run using Planned Independent Requirements in order to purchase the input materials but the finished goods is not allowed to be produced until the Sales Orders arrive.

(only one answer)

A)    Strategy 10.
B)    Strategy 20.
C)    Strategy 30.
D)    Strategy 40.
E)    Strategy 50.
.