Question no 1629: User Status
In SAP PM ECC6.0, which of the following do not allow user status assignment ?
(more then one answers)
A) Components in Maintenance Order.
B) Task list header.
C) Task list operations.
D) Notification's Task.
E) Notification's Activities.
.
(more then one answers)
A) Components in Maintenance Order.
B) Task list header.
C) Task list operations.
D) Notification's Task.
E) Notification's Activities.
.
Question no 1628: User Status
In SAP PM ECC6.0, which of the following in Plant Maintenance allow the use of user Status ?
(more then one answers)
A) Equipment Master.
B) Functional Location Master.
C) Maintenance Order Header.
D) Maintenance Order Operations.
E) Maintenance Order's PRT Assignment to Operations.
.
(more then one answers)
A) Equipment Master.
B) Functional Location Master.
C) Maintenance Order Header.
D) Maintenance Order Operations.
E) Maintenance Order's PRT Assignment to Operations.
.
Sunday, July 29, 2012
Question no 1627: Default value profile
In SAP PM ECC6.0, which of the following are defaults values possible for the Default value profile assigned to the Maintenance Order type ?
(more then one answers)
A) Purchasing Group.
B) Purchasing Organization.
C) Cost Center.
D) Cost Element.
E) Vendor.
.
(more then one answers)
A) Purchasing Group.
B) Purchasing Organization.
C) Cost Center.
D) Cost Element.
E) Vendor.
.
Saturday, July 28, 2012
Question no 1626: Capacity Category
In SAP PM ECC6.0, the Work Center Category used to create the Maintenance Work center provides which of the following configuration parameters ?
(more then one answers)
A) Field selection.
B) Screen sequence.
C) Change document creation activation.
D) Application assignment.
E) Cost center default.
.
(more then one answers)
A) Field selection.
B) Screen sequence.
C) Change document creation activation.
D) Application assignment.
E) Cost center default.
.
Thursday, July 26, 2012
Question no 1625: PM Configuration
In SAP PM ECC6.0, which of the following configuration setup can be shared or assigned to both maintenance notification type and maintenance order type ? (example: same configuration object can be assigned to both)
(more then one answers)
A) User status profile.
B) Object information key.
C) Partner determination procedure.
D) Priority type.
E) Settlement profile.
.
(more then one answers)
A) User status profile.
B) Object information key.
C) Partner determination procedure.
D) Priority type.
E) Settlement profile.
.
Wednesday, July 25, 2012
Question no 1624: Configuration parameters in PM
In SAP PM ECC6.0, which of the following configuration parameters are common and therefore can be configured for both Maintenance Notification and Maintenance Order ?
(more then one answers)
A) User status profile.
B) Object information key.
C) Priority type.
D) Partner determination procedure.
E) Catalog profile.
.
(more then one answers)
A) User status profile.
B) Object information key.
C) Priority type.
D) Partner determination procedure.
E) Catalog profile.
.
Tuesday, July 24, 2012
Question no 1623: Catalog Profile
In SAP PM ECC6.0, the Catalog Profile ____________________ .
(more then one answers)
A) The same catalog profile can be assigned to Notification type, Equipment master, or Functional location master.
B) A catalog profile can be assigned to one or more Notification type.
C) The same catalog profile can be assigned to both Notification type and Maintenance Order type.
D) The same catalog profile cannot be assigned to Notification type, Equipment master, and Functional location.
E) Assignment of catalog profile to notification type is optional.
.
(more then one answers)
A) The same catalog profile can be assigned to Notification type, Equipment master, or Functional location master.
B) A catalog profile can be assigned to one or more Notification type.
C) The same catalog profile can be assigned to both Notification type and Maintenance Order type.
D) The same catalog profile cannot be assigned to Notification type, Equipment master, and Functional location.
E) Assignment of catalog profile to notification type is optional.
.
Monday, July 23, 2012
Question no 1622: Plant Maintenance Notification Types
In SAP PM ECC6.0 which of the following configuration parameters are available for Plant Maintenance Notification ?
(more then one answers)
A) Shop papers and Printer Control parameters.
B) Assignment of Partner Determination Procedure.
C) Settlement profile.
D) User Status profile.
E) Early number allocation for number range assignment.
.
(more then one answers)
A) Shop papers and Printer Control parameters.
B) Assignment of Partner Determination Procedure.
C) Settlement profile.
D) User Status profile.
E) Early number allocation for number range assignment.
.
Sunday, July 22, 2012
Question no 1621: Catalog for PM Notification
In SAP PM ECC6.0, which of the following is not a valid possible Catalog to be used in Plant Maintenance Notification ?
(only one answer)
A) Object Part.
B) Damage.
C) Usage Decision.
D) Task.
E) Activities.
.
(only one answer)
A) Object Part.
B) Damage.
C) Usage Decision.
D) Task.
E) Activities.
.
Saturday, July 21, 2012
Question no 1620: Field selection in PM Notification
In SAP PM ECC6.0, which of the following are influencing factors for field selection for Reference Objects PM Notification ?
(more then one answers)
A) Activity Category.
B) Notification Origin.
C) Catalog Profile.
D) Priority.
E) Notification Type.
.
(more then one answers)
A) Activity Category.
B) Notification Origin.
C) Catalog Profile.
D) Priority.
E) Notification Type.
.
Friday, July 20, 2012
Question no 1619: Service Profile
In SAP PM ECC6.0, The Service Profile and Response Profile assigned to the Notification type will allow you to do which of the following ?
(more then one answers)
A) Default the Task codes into the Task folder in the Notification.
B) Default the Activities codes into the Activities folder in the Notification.
C) Calculate the Task codes Planned finish date and time.
D) Calculate the Activities codes Planned finish date and time.
E) Define the service window available for the Planned finish date and time calculation.
.
(more then one answers)
A) Default the Task codes into the Task folder in the Notification.
B) Default the Activities codes into the Activities folder in the Notification.
C) Calculate the Task codes Planned finish date and time.
D) Calculate the Activities codes Planned finish date and time.
E) Define the service window available for the Planned finish date and time calculation.
.
Thursday, July 19, 2012
Question no 1618: Priority type in Plant Maintenance
In SAP PM ECC6.0, select the correct statements about the configuration of Priority type in SAP Plant Maintenance.
(more the one answers)
A) The same priority type can be assigned to both Notification type and Maintenance Order type.
B) The same priority type can be assigned to one or more Notification type.
C) The priorities in the priority type can be used to determine the Required Start date of the Notification.
D) The priorities in the priority type can be used to determine the Required End date of the Notification.
E) The priorities in the priority type can be used for activating work flow activities.
.
(more the one answers)
A) The same priority type can be assigned to both Notification type and Maintenance Order type.
B) The same priority type can be assigned to one or more Notification type.
C) The priorities in the priority type can be used to determine the Required Start date of the Notification.
D) The priorities in the priority type can be used to determine the Required End date of the Notification.
E) The priorities in the priority type can be used for activating work flow activities.
.
Wednesday, July 18, 2012
Question no 1617: PM Notification format long text
In SAP PM ECC6.0, the PM Notification type configuration of "Format Long Text" allows you to do which of the following configuration ?
(more the one answers)
A) Create a Log Line for each text entry.
B) Ensure text entry is mandatory.
C) Assign text screen to the Notification initial screen.
D) Not allow to change text after it is created.
E) Authorization setup for which user to enter text.
.
(more the one answers)
A) Create a Log Line for each text entry.
B) Ensure text entry is mandatory.
C) Assign text screen to the Notification initial screen.
D) Not allow to change text after it is created.
E) Authorization setup for which user to enter text.
.
Tuesday, July 17, 2012
Question no 1616: Notification type
In SAP PM ECC6.0, which of the following is TRUE about the Notification type Customizing ?
(more then one answers)
A) The Notification category is defaulted due to the Notification Origin assigned to the Notification type.
B) Early number allocation is possible for the Notification type.
C) Only either internal number range or external number range are available for each Notification type.
D) Assignment of Priority type to the Notification type is optional.
E) If Screen Structure for Extended view is not setup for the Notification type, during the notification creation the system will use the standard screens.
.
(more then one answers)
A) The Notification category is defaulted due to the Notification Origin assigned to the Notification type.
B) Early number allocation is possible for the Notification type.
C) Only either internal number range or external number range are available for each Notification type.
D) Assignment of Priority type to the Notification type is optional.
E) If Screen Structure for Extended view is not setup for the Notification type, during the notification creation the system will use the standard screens.
.
Sunday, July 15, 2012
Question no 1615: Maintenance Plan for External Services
In SAP PM ECC6.0, the characteristics of Maintenance Plan for External Services are ?
(more then one answers)
A) After approval of the Service Entry Sheet, the costs are debited into the Cost Center assigned in the Maintenance Plan.
B) On maintenance due, Service Entry Sheet is generated against the Framework Purchase Order.
C) The General Ledger for the Expenses account to be debited at approval of the Service Entry Sheet is defaulted from the Technical Object assigned in the Maintenance Plan.
D) After approval of the Service Entry Sheet, the costs are debited into the Settlement Order assigned in the Maintenance Plan.
E) A Purchase Order document type is entered in the Maintenance Plan for the Framework Order creation when maintenance is due.
.
(more then one answers)
A) After approval of the Service Entry Sheet, the costs are debited into the Cost Center assigned in the Maintenance Plan.
B) On maintenance due, Service Entry Sheet is generated against the Framework Purchase Order.
C) The General Ledger for the Expenses account to be debited at approval of the Service Entry Sheet is defaulted from the Technical Object assigned in the Maintenance Plan.
D) After approval of the Service Entry Sheet, the costs are debited into the Settlement Order assigned in the Maintenance Plan.
E) A Purchase Order document type is entered in the Maintenance Plan for the Framework Order creation when maintenance is due.
.
Saturday, July 14, 2012
Question no 1614: Hiearchy in Maintenance Packages in Preventive Maintenance
In SAP PM ECC6.0, which of the following are true about Hiearchy in Maintenance Packages in Preventive Maintenance ?
(more then one answers)
A) If two packages with the same hierarchy are due at the same time, then both packages are performed.
B) If two packages have different hierarchies, only the package with the higher hierarchy is performed.
C) If two packages with the same hierarchy are due at the same time, then the package with the least operation time is performed.
D) If two packages have different hierarchies, only the package with the higher operation time is performed.
E) If two packages with the same hierarchy are due at the same time, no packages will are performed.
.
(more then one answers)
A) If two packages with the same hierarchy are due at the same time, then both packages are performed.
B) If two packages have different hierarchies, only the package with the higher hierarchy is performed.
C) If two packages with the same hierarchy are due at the same time, then the package with the least operation time is performed.
D) If two packages have different hierarchies, only the package with the higher operation time is performed.
E) If two packages with the same hierarchy are due at the same time, no packages will are performed.
.
Friday, July 13, 2012
Question no 1613: Call Horizon
In SAP PM ECC6.0, When the Call Horizon is 0 %, ___________________ .
(only one answer)
A) The Planning will be done for the entire horizon of the scheduling period.
B) The Call Date is exactly one cycle before the Plan Date / Due Date.
C) The Call Date is exactly one cycle later then the Plan Date / Due Date.
D) The Call Date = Plan Date / Due Date.
E) This is not possible as 0 (Zero) is not a valid entry.
.
(only one answer)
A) The Planning will be done for the entire horizon of the scheduling period.
B) The Call Date is exactly one cycle before the Plan Date / Due Date.
C) The Call Date is exactly one cycle later then the Plan Date / Due Date.
D) The Call Date = Plan Date / Due Date.
E) This is not possible as 0 (Zero) is not a valid entry.
.
Wednesday, July 11, 2012
Question no 1612: Call Horizon
In SAP PM ECC6.0, When the Call Horizon is 100 %, ___________________ .
(only one answer)
A) The Planning will be done for the entire horizon of the scheduling period.
B) The Call Date is exactly one cycle before the Plan Date / Due Date.
C) The Call Date is exactly one cycle later then the Plan Date / Due Date.
D) The Call Date = Plan Date / Due Date.
E) The Call Date is at the end of the horizon of the scheduling period.
.
(only one answer)
A) The Planning will be done for the entire horizon of the scheduling period.
B) The Call Date is exactly one cycle before the Plan Date / Due Date.
C) The Call Date is exactly one cycle later then the Plan Date / Due Date.
D) The Call Date = Plan Date / Due Date.
E) The Call Date is at the end of the horizon of the scheduling period.
.
Tuesday, July 10, 2012
Question no 1611: Hierarchy of Maintenance Package
In SAP ECC6.0, deduce the scheduling results of the following Strategy Plan Setup ?
Maintenance Package (1M) : Hierarchy 1
Maintenance Package (6M) : Hierarchy 1
Maintenance Package (12) : Hierarchy 2
Maintenance Task List has the following operations and Package assignment
----------------------1M----6M----12
Operation 10------X-----X-----X
Operation 20------X-----X
Operation 30--------------------X
(the above illustration may not be correctly aligned)
Package 1M, 6M, 12 are assigned to Operation 10
Package 1M, 6M are assigned to Operation 20
Package 12 is assigned to Operation 30
When the Maintenance Plan is schedule, at Package 6M, how will be maintenance order be created ?
(only one answer)
A) Operation 10 only.
B) Operation 10, 20.
C) Operation 10, 20, 30.
D) Operation 10, 10, 30.
E) Operation 10, 30.
.
Maintenance Package (1M) : Hierarchy 1
Maintenance Package (6M) : Hierarchy 1
Maintenance Package (12) : Hierarchy 2
Maintenance Task List has the following operations and Package assignment
----------------------1M----6M----12
Operation 10------X-----X-----X
Operation 20------X-----X
Operation 30--------------------X
(the above illustration may not be correctly aligned)
Package 1M, 6M, 12 are assigned to Operation 10
Package 1M, 6M are assigned to Operation 20
Package 12 is assigned to Operation 30
When the Maintenance Plan is schedule, at Package 6M, how will be maintenance order be created ?
(only one answer)
A) Operation 10 only.
B) Operation 10, 20.
C) Operation 10, 20, 30.
D) Operation 10, 10, 30.
E) Operation 10, 30.
.
Monday, July 9, 2012
Question no 1610: Hierarchy of Maintenance Package
In SAP ECC6.0, deduce the scheduling results of the following Strategy Plan Setup ?
Maintenance Package (1M) : Hierarchy 1
Maintenance Package (6M) : Hierarchy 1
Maintenance Package (12) : Hierarchy 2
Maintenance Task List has the following operations and Package assignment
----------------------1M----6M----12
Operation 10------X-----X-----X
Operation 20------X-----X
Operation 30--------------------X
(the above illustration may not be correctly aligned)
Package 1M, 6M, 12 are assigned to Operation 10
Package 1M, 6M are assigned to Operation 20
Package 12 is assigned to Operation 30
When the Maintenance Plan is schedule, at Package 12, how will be maintenance order be created ?
(only one answer)
A) Operation 10 only.
B) Operation 10, 20.
C) Operation 10, 20, 30.
D) Operation 10, 10, 30.
E) Operation 10, 30.
.
Maintenance Package (1M) : Hierarchy 1
Maintenance Package (6M) : Hierarchy 1
Maintenance Package (12) : Hierarchy 2
Maintenance Task List has the following operations and Package assignment
----------------------1M----6M----12
Operation 10------X-----X-----X
Operation 20------X-----X
Operation 30--------------------X
(the above illustration may not be correctly aligned)
Package 1M, 6M, 12 are assigned to Operation 10
Package 1M, 6M are assigned to Operation 20
Package 12 is assigned to Operation 30
When the Maintenance Plan is schedule, at Package 12, how will be maintenance order be created ?
(only one answer)
A) Operation 10 only.
B) Operation 10, 20.
C) Operation 10, 20, 30.
D) Operation 10, 10, 30.
E) Operation 10, 30.
.
Sunday, July 8, 2012
Question no 1609: Maintenance Plan
In SAP PM ECC6.0, which of the following are common data fields available in the Maintenance Item for Call Object Maintenance Order and Maintenance Notification ?
(more then one answers)
A) Planning Plant and Planner Group.
B) Maintenance Work Center and Maintenance Activity Type.
C) Priority.
D) Automatic Determination of Task indicator.
E) Scheduling Parameters.
.
(more then one answers)
A) Planning Plant and Planner Group.
B) Maintenance Work Center and Maintenance Activity Type.
C) Priority.
D) Automatic Determination of Task indicator.
E) Scheduling Parameters.
.
Saturday, July 7, 2012
Question no 1608: Maintenance Plan
In SAP PM ECC6.0, the Single Cycle Maintenance Plan for call object Maintenance Notification will have the following characteristics EXCEPT.
(more the one answers)
A) Only one Maintenance Item is allowed for each Maintenance Plan.
B) One or more Maintenance Items are allowed for each Maintenance Plan.
C) Each Maintenance Item can only have one Reference Object.
D) Each Maintenance Item can have one or more Reference Object.
E) Each Maintenance Item must have a Maintenance Task List.
.
(more the one answers)
A) Only one Maintenance Item is allowed for each Maintenance Plan.
B) One or more Maintenance Items are allowed for each Maintenance Plan.
C) Each Maintenance Item can only have one Reference Object.
D) Each Maintenance Item can have one or more Reference Object.
E) Each Maintenance Item must have a Maintenance Task List.
.
Friday, July 6, 2012
Question no 1607: Calling External Services
In SAP PM ECC6.0, when a Maintenance Plan is created to call External Service's Service Entry Sheet, which of the following data are mandatory (in the Standard SAP system) in the Maintenance Item.
(more then one answers)
A) Framework Purchase Order.
B) G/L Account.
C) Settlement Order.
D) Service Master.
E) Order type.
.
(more then one answers)
A) Framework Purchase Order.
B) G/L Account.
C) Settlement Order.
D) Service Master.
E) Order type.
.
Thursday, July 5, 2012
Question no 1606: Single-Cycle Maintenance Plan for Calling Service Entry Sheet
In SAP PM ECC6.0, the Maintenance Plan for call object service entry sheet will have the following Maintenance Plan Structure characteristics.
(more then one answers)
A) One Maintenance Item only for each Maintenance Plan.
B) One or more Maintenance Item for each Maintenance Plan.
C) The Maintenance Item requires one more technical objects to be entered.
D) Maintenance Task List is not mandatory but possible in the Maintenance Item.
E) A Purchase Order, G/L Account, and Settlement order is required.
.
(more then one answers)
A) One Maintenance Item only for each Maintenance Plan.
B) One or more Maintenance Item for each Maintenance Plan.
C) The Maintenance Item requires one more technical objects to be entered.
D) Maintenance Task List is not mandatory but possible in the Maintenance Item.
E) A Purchase Order, G/L Account, and Settlement order is required.
.
Tuesday, July 3, 2012
Question no 1605 : Profile for Default value for Maintenance Task List
In SAP PM ECC6.0, the characteristics of the Profile for Default value for Maintenance Task List are _________________ .
(more then one answers)
A) Default the Maintenance Work Center.
B) Default the Task List Usage and Task List Status.
C) Assign a Field Key.
D) Ensure a graphic profile is available for Network operations maintenance.
E) Default the Control Key.
.
(more then one answers)
A) Default the Maintenance Work Center.
B) Default the Task List Usage and Task List Status.
C) Assign a Field Key.
D) Ensure a graphic profile is available for Network operations maintenance.
E) Default the Control Key.
.
Monday, July 2, 2012
Question no 1604: View Profile for Plant Maintenance
In SAP PM ECC6.0, which of the following are valid view profiles screen groups for configuring the Functional Location Category and Equipment Category ?
(more the one answers)
A) H1 screen group serial number data.
B) H2 screen group equipment data.
C) H3 screen group functional location data.
D) H4 screen group fleet object data.
E) H5 screen group asset integration data.
.
(more the one answers)
A) H1 screen group serial number data.
B) H2 screen group equipment data.
C) H3 screen group functional location data.
D) H4 screen group fleet object data.
E) H5 screen group asset integration data.
.
Answer: B, C, D
Sunday, July 1, 2012
Question no 1603: Influencing factor for Equipment Field Selection
In SAP PM, which of the following not an influencing factor for the field selection of Equipment specific fields ?
(only one answer)
A) Equipment Category.
B) Equipment Reference Category.
C) Activity Category.
D) Technical Object type.
E) Maintenance Plant.
.
(only one answer)
A) Equipment Category.
B) Equipment Reference Category.
C) Activity Category.
D) Technical Object type.
E) Maintenance Plant.
.