Monday, January 31, 2011

Question no 949 : MM Purchasing MPN Material type

In SAP MM-Purchasing, which of the following material type is used to created MPN materials ?

(only one answer)

A)    ROH.
B)    MPN.
C)    HERS.
D)    HERB.
E)    UNBW.
.

Question no 948 : APO SNP Optimization Characteristics

In SAP APO-SNP, Which of the following best describes the Optimizer characteristics in SNP run ?

(more then one answers)

A)   Quota Arrangement is used.
B)   Prioritization rules applied.
C)   Product Resources are evaluated Globally.
D)   It produces the highest quality output compared to other SNP methods.
E)   Costs factors are used.
.

Saturday, January 29, 2011

Question no 947 : APO SNP Planning Methods

In SAP APO-SNP, Which of the following Planning methods looks at Resources only as a 2nd step calculation and locally as well ?

(only one answer)

A)    Heuristic.
B)    Genetic Algorithm.
C)    Croston.
D)    Optimizer.
E)    CTM.
.

Question no 946 : APO SNP Planning Method identification

In SAP APO-SNP, _______________ is a rule-based method of extensive prioritization capabilities with finite and global planning of resources.

(only one answer)

A)    Heuristic.
B)     Genetic Algorithm.
C)    Croston.
D)    Optimizer.
E)     CTM.
 .

Friday, January 28, 2011

Question no 945 : APO SNP Planning Options

In SAP APO-SNP, Which of the following are Planning Possibilities in SNP ?

(more then one answer)

A)   Heuristic.
B)    Genetic Algorithm.
C)    Croston.
D)    Optimizer.
E)     CTM.
.

Question no 944 : APO SNP Deployment Process functions

In SAP APO-SNP, Which of the following are the functions of the Deployment Process ?

(more then one answer)

A)   The result of the Deployment creates Stock Transfer Orders in SAP ECC.
B)   The result of the Deployment creates Deliveries Orders in SAP ECC.
C)   The result of the Deployment calculates the Safety Stocks in SAP ECC.
D)   The result of the Deployment confirms stock transfers planned in the SNP run.
E)   The result of the Deployment deletes the PPDS production orders.
.

Tuesday, January 25, 2011

Question no 943 : APO SNP and PPDS Horizon

In SAP APO SNP, Check the understand of SNP and PPDS Horizons for the TRUE depictions ?

(more the one answers)

A)    It is not possible to have the PPDS Horizon comes after the SNP Horizon.
B)    PPDS planning runs only takes place within the PPDS Horizon.
C)    The PPDS and SNP Horizons are CIFted to APO from R/3’s planning time fences in the material master MRP 1 view.
D)    Pegging requirements are not possible in SNP planning results.
E)     SNP run is purely based on Quantity and Periods.
.

Question no 942 : APO SNP Planned Order characteristics

In SAP-APO SNP, Evaluate the following statements regarding SNP Planned Orders, select the statements which are CORRECT ?

(more then one answers)

A)   SNP Planned orders can only be created and changed by SNP.
B)    SNP Planned orders cannot b created by PP/DS but can be changed by it.
C)    SNP Planned orders can only be created by the SNP run with an end date outside the SNP Horizon.
D)   All non-fixed SNP Planned Orders are deleted by the PPDS planning run within the SNP Horizon.
E)    All non-fixed SNP Planned Orders are deleted by the PPDS planning run within the PPDS Horizon.
.

Sunday, January 23, 2011

Question no 941 : APO Sequence of SNP Planning Process

In SAP APO SNP, which of the following depict the correct sequence of SNP Planning Process ?

(only one answer)

I)     Execute TLB Run.
II)    PP/DS Run.
III)   Execute Deployment Planning Run.
IV)   Execute SNP Run.
V)    Release Demand Plan.
VI)   Check/Resolve SNP Run Issues.

A)   I, III, II, IV, VI, V.
B)   V, I, III, IV, V, II.
C)   V, VI, IV, III, I, II.
D)   V, VI, IV, II, III, I.
E)    V, IV, VI, II, III, I.

Question no 940 : APO SNP Master Data

In SAP APO SNP, which of the following statements are TRUE regarding master data fro SNP ?

(more then one answers)  

A)    There is no need to generate SNP PDS for SNP PPM's for a successful SNP run.
B)     SNP planning run can use PPDS PPMs.
C)     Work centers can be excluded from SNP planning run by setting the relevant indicators in the relevant Work Centers.
D)     SNP PPMs need not be the same in content as the PPDS PPMs.
E)     You can Core-Interface directly from R/3 BOM and Routing to generated SNP PPMs.
.

Saturday, January 22, 2011

Question no 939 : APO DP vs R/3 SOP

In SAP APO's Demand Planning comparing it against the R/3 SOP, what advantages does the APO DP has over R/3 SOP ?

(more then one answers)

A)    Integrated exception handling.
B)    BOM explosion.
C)    Budgeting.
D)    Using BW for data storage.
E)    Multiple Regression.
.

Question no 938: APO Demand Planning Univariate Forecasting

In APO, which of the following are not considered as a technique in Univariate forecasting ?

(only one answer)

A)    Croston.
B)    Seasonal Trend.
C)    Trend.
D)    Constant.
E)    Multiple Regression.
.

Friday, January 21, 2011

Question no 937: APO DP Collaborative Planning

In SAP APO-Demand Planning, Collaborative Planning is design for :

(more then one answers)

A)     Exchange of large volumes of current data.
B)     Exchange of small volumes of current data.
C)     Macros, Alerts, and Notes can be used in Collaborative Planning.
D)     Setting up and ITS server is desirable.
E)     It can be used in both DP and SNP.
.

Question no 936 : APO Croston Forecasting Method

In SAP APO Demand Planning, the Croston Forecasting Method is useful for which data types ?

(only one answer)

A)   Make-to-Order Scenario.
B)   Sporadic Demands.
C)   Consistent Demands.
D)   Multiple variable data types.
E)   Seasonal demands.
.

Wednesday, January 19, 2011

Question no 935: APO Supply Chain Engineer Functionality

In SAP APO, which of the following are functionalities of the SCE or Supply Chain Engineer ?

(more then one answers) 

A)   You can run queries of dependent information individual or combined elements in the supply chain.
B)    You can assign or delete large quantities of objects in the model.
C)    Work areas are possible for managing the view and display of large amounts of supply chain objects.
D)    You can navigate to the R/3 Stocks Requirements List.
E)     You can mapped transportation lanes within the model.
.

Tuesday, January 18, 2011

Question no 934 : Active version in APO

When sending data from R/3 to APO via the Integration model, which of the following statement is TRUE ?

A)    Only active version Master data in R/3 can be transferred to APO active version Master data.
B)    Both active version and non-active version Master data in R/3 can be transferred to APO's active and non-active version Master data.
C)    Material master or Product in APO can have one active version and multiple non-active versions.
D)    Active versions APO master data are only stored in the DataBase and not in the Life-Cache.
E)     Only non-active version Master data in R/3 can be transferred to APO non-active version Master data.
.

Question no 933 : APO-R/3 PP Setting MRP type "X0" for Material Master

When transferring material master from R/3 to APO, materials with MRP type "X0" to be included in the integration model are said to be SCM-relevant master data, what is the significance of this material in the R/3 System ?

(more then one answer)

A)     In R/3 SOP, MPS, MRP planning no longer recognizes this material.
B)     In R/3 MPS, MRP planning no longer recognizes this material.
C)     In R/3 the material is no longer seen in the Stocks Requirements list.
D)     In R/3 the material can be allowed MRP planning run but not MPS planning run.
E)     In R/3 the material need not have a Bills of Material and Routing.
,