In SAP APO-SNP, Which of the following best describes the Optimizer characteristics in SNP run ?
(more then one answers)
A) Quota Arrangement is used.
B) Prioritization rules applied.
C) Product Resources are evaluated Globally.
D) It produces the highest quality output compared to other SNP methods.
E) Costs factors are used.
.
In SAP APO-SNP, Which of the following are the functions of the Deployment Process ?
(more then one answer)
A) The result of the Deployment creates Stock Transfer Orders in SAP ECC.
B) The result of the Deployment creates Deliveries Orders in SAP ECC.
C) The result of the Deployment calculates the Safety Stocks in SAP ECC.
D) The result of the Deployment confirms stock transfers planned in the SNP run.
E) The result of the Deployment deletes the PPDS production orders.
.
In SAP APO SNP, Check the understand of SNP and PPDS Horizons for the TRUE depictions ?
(more the one answers)
A) It is not possible to have the PPDS Horizon comes after the SNP Horizon.
B) PPDS planning runs only takes place within the PPDS Horizon.
C) The PPDS and SNP Horizons are CIFted to APO from R/3’s planning time fences in the material master MRP 1 view.
D) Pegging requirements are not possible in SNP planning results.
E) SNP run is purely based on Quantity and Periods.
.
In SAP-APO SNP, Evaluate the following statements regarding SNP Planned Orders, select the statements which are CORRECT ?
(more then one answers)
A) SNP Planned orders can only be created and changed by SNP.
B) SNP Planned orders cannot b created by PP/DS but can be changed by it.
C) SNP Planned orders can only be created by the SNP run with an end date outside the SNP Horizon.
D) All non-fixed SNP Planned Orders are deleted by the PPDS planning run within the SNP Horizon.
E) All non-fixed SNP Planned Orders are deleted by the PPDS planning run within the PPDS Horizon.
In SAP APO-Demand Planning, Collaborative Planning is design for :
(more then one answers)
A) Exchange of large volumes of current data.
B) Exchange of small volumes of current data.
C) Macros, Alerts, and Notes can be used in Collaborative Planning.
D) Setting up and ITS server is desirable.
E) It can be used in both DP and SNP.
.
When sending data from R/3 to APO via the Integration model, which of the following statement is TRUE ?
A) Only active version Master data in R/3 can be transferred to APO active version Master data.
B) Both active version and non-active version Master data in R/3 can be transferred to APO's active and non-active version Master data.
C) Material master or Product in APO can have one active version and multiple non-active versions.
D) Active versions APO master data are only stored in the DataBase and not in the Life-Cache.
E) Only non-active version Master data in R/3 can be transferred to APO non-active version Master data.
.
When transferring material master from R/3 to APO, materials with MRP type "X0" to be included in the integration model are said to be SCM-relevant master data, what is the significance of this material in the R/3 System ?
(more then one answer)
A) In R/3 SOP, MPS, MRP planning no longer recognizes this material.
B) In R/3 MPS, MRP planning no longer recognizes this material.
C) In R/3 the material is no longer seen in the Stocks Requirements list.
D) In R/3 the material can be allowed MRP planning run but not MPS planning run.
E) In R/3 the material need not have a Bills of Material and Routing.
,