In SAP QM, In the course of inspcetion result recording for production:
I) Inspection results can be recorded for the inspection charaacteristics.
II) Defects cannot be recorded.
III) Unplanned characteristics cannot be added.
IV) When inspection points are available, multiple results fro the same inspection characteristics can be entered.
V) Control charts can be visible if the inspection characteristics were assigned with appropriate sampling procedures.
A) I, II, III, V
B) II, III, V
C) I, II, III, IV
D) I, II, IV
E) I, II, IV, V
.
This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes
▼
Wednesday, April 29, 2009
Monday, April 27, 2009
Question no : 129 PS Logistics Floats
In SAP PS, total float is ?
I) Latest start - Earliest start.
II) Latest finish - Earliest start.
III) Latest finish - Earliest finish.
IV) Earliest finish - Earliest start.
A) I, II
B) I, III
C) II, IV
D) II, III
E) I, II, III, IV
.
I) Latest start - Earliest start.
II) Latest finish - Earliest start.
III) Latest finish - Earliest finish.
IV) Earliest finish - Earliest start.
A) I, II
B) I, III
C) II, IV
D) II, III
E) I, II, III, IV
.
Saturday, April 25, 2009
Question no : 128 PS Logistics Control Key
In SAP PS, The control key for network activities can be used to control the following except:
A) Scheduling.
B) Detailed capacity requirement.
C) Cost.
D) Externally processed activity.
E) Operation relationships.
.
A) Scheduling.
B) Detailed capacity requirement.
C) Cost.
D) Externally processed activity.
E) Operation relationships.
.
Thursday, April 23, 2009
Question no : 127 PS Organization Project Builder
In SAP PS, You can maintain/create which of the following objects in the Project Builder ?
I) Work Breakdown Structure.
II) Work Center.
III) Network.
IV) Milestone.
V) Project definition.
A) I, III
B) I, III, V
C) III, V
D) I, III, IV
E) I, III, IV, V
.
I) Work Breakdown Structure.
II) Work Center.
III) Network.
IV) Milestone.
V) Project definition.
A) I, III
B) I, III, V
C) III, V
D) I, III, IV
E) I, III, IV, V
.
Tuesday, April 21, 2009
Question no : 126 PM Master Data basic concepts
In SAP PM/CS, Which of the following Plant Maintenance master data object you can assign construction type ?
I) Equipment master.
II) Functional location.
III) Material BOM.
IV) Sub-equipment master.
V) Asset master.
A) I, II
B) I, II, III
C) I, II, IV
D) I, II, V
E) II, IV, V
.
I) Equipment master.
II) Functional location.
III) Material BOM.
IV) Sub-equipment master.
V) Asset master.
A) I, II
B) I, II, III
C) I, II, IV
D) I, II, V
E) II, IV, V
.
Friday, April 17, 2009
Question no : 125 CO Product Cost Estimate
In SAP CO, Which of the following master data type allows you to control Cost estimate using Quantity Structure or without Quantity Structure for a material master ?
A) Material Group.
B) Material Type.
C) Industrial Sector.
D) Costing Type.
E) Pricing Control.
.
A) Material Group.
B) Material Type.
C) Industrial Sector.
D) Costing Type.
E) Pricing Control.
.
Wednesday, April 15, 2009
Question no : 124 CO Production Costing Valuation Variant
In SAP CO, The Valuation Variant in the Costing Variant allows you to determine which of the following costs ?
I) Material Cost.
II) Activity Based Cost.
III) Subcontracting Cost.
IV) Operation Cost.
V) Mix Cost Structure from 2 BOMs.
A) I, II, IV
B) I, IV
C) I, II, III, IV
D) I, III, IV
E) I, II, III, IV, V
.
I) Material Cost.
II) Activity Based Cost.
III) Subcontracting Cost.
IV) Operation Cost.
V) Mix Cost Structure from 2 BOMs.
A) I, II, IV
B) I, IV
C) I, II, III, IV
D) I, III, IV
E) I, II, III, IV, V
.
Monday, April 13, 2009
Question no : 123 QM Master Data Block Purchasing
In SAP QM, Which of the methods or master data can you block Purchase Order creation from a vendor and or material master ?
I) Material master's material status.
II) Vendor master block.
III) Quality Info Record.
IV) Source List.
V) Quota Arrangement.
A) I, II, IV
B) II, IV
C) I, II, III, IV
D) I, II, IV, V
E) I, II, III, IV, V
.
I) Material master's material status.
II) Vendor master block.
III) Quality Info Record.
IV) Source List.
V) Quota Arrangement.
A) I, II, IV
B) II, IV
C) I, II, III, IV
D) I, II, IV, V
E) I, II, III, IV, V
.
Saturday, April 11, 2009
Question no : 122 QM Master Data Quality Agreement
In SAP QM, The setting of requirements of Quality Agreement checking during the creation of Purchase Order is done using which of the following keys ?
A) Quality Info Record.
B) QM Control Key.
C) Inspection Plan.
D) Source List.
E) Dynamic Modification.
.
A) Quality Info Record.
B) QM Control Key.
C) Inspection Plan.
D) Source List.
E) Dynamic Modification.
.
Wednesday, April 8, 2009
Question no : 121 QM Master Data "Un-restricted Stock" activation
In SAP QM, In order to place the stocks of a QM activated material into "Un-restricted Stock" duirng the Inspection Lot creation; you should perform which of the following setup ?
A) Set "Post to UR" at the Quality Info Record.
B) Set it in the Configuration of the relevant Inspection Type.
C) Set it at the Configuration of the relevant Plant when the Inspection Lot is created.
D) Do the setting in the Material master QM view's relevant Inspection Type detail.
E) Do the setting in the Material master Plant/Storage view to post to "UR".
.
A) Set "Post to UR" at the Quality Info Record.
B) Set it in the Configuration of the relevant Inspection Type.
C) Set it at the Configuration of the relevant Plant when the Inspection Lot is created.
D) Do the setting in the Material master QM view's relevant Inspection Type detail.
E) Do the setting in the Material master Plant/Storage view to post to "UR".
.
Sunday, April 5, 2009
Question no : 121 QM Inspection basic concept
In SAP QM, What are the two main objects relevant for Inspection Lot processing ?
I) Material Master
II) Equipment Master
III) Asset Master
IV) Service Master
A) I, III
B) I, II, III
C) I, II
D) I, II, III, IV
E) I only
.
I) Material Master
II) Equipment Master
III) Asset Master
IV) Service Master
A) I, III
B) I, II, III
C) I, II
D) I, II, III, IV
E) I only
.
Thursday, April 2, 2009
Question no : 120 PP Planning MRP and Scheduling Agreement
In SAP PP/MM, Which master data setup is required when the automatic generation of delivery schedule against the scheduling agreement is required from the MRP run ?
A) Quota arrangement.
B) Purchasing info record.
C) Scheduling agreement.
D) Source list.
E) Auto delivery schedule indicator in the vendor master.
.
A) Quota arrangement.
B) Purchasing info record.
C) Scheduling agreement.
D) Source list.
E) Auto delivery schedule indicator in the vendor master.
.