What is the baseline date in Logistics Invoice Verification ?
A) It is the date from which the payment terms begin to calculate for any applicable discounts.
B) It is the date from which the payment is due before any penalty is imposed.
C) It is the date from which archiving of the Invoice will be executed.
D) It is the date from which the Invoice will be set a deletion flag.
E) It is the date from which the Invoice will be automatically release for payment.
.
This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes
▼
Friday, March 27, 2009
Wednesday, March 25, 2009
Question no : 118 MM Purchasing document creation
Which of the following is NOT TRUE about Purchasing document creation ?
A) Create Purchase Order with reference to a Contract.
B) Create Purchase Order with reference to a Scheduling Agreement.
C) Create Scheduling Agreement with reference to a Contract.
D) Create Contract with reference to an RFQ/Quotation.
E) Create Purchase Order with reference to another Purchase Order.
.
A) Create Purchase Order with reference to a Contract.
B) Create Purchase Order with reference to a Scheduling Agreement.
C) Create Scheduling Agreement with reference to a Contract.
D) Create Contract with reference to an RFQ/Quotation.
E) Create Purchase Order with reference to another Purchase Order.
.
Monday, March 23, 2009
Question no : 117 MM Purchasing History
Which of the following document types you can find in the Purchase Order History ?
I) Goods Issue material document.
II) Goods Receipt material document.
III) Service Entry Sheet.
IV) Referenced Contract detail.
V) Invoice document.
A) I, II
B) II
C) II, III
D) II, III, IV
E) II, III, V
.
I) Goods Issue material document.
II) Goods Receipt material document.
III) Service Entry Sheet.
IV) Referenced Contract detail.
V) Invoice document.
A) I, II
B) II
C) II, III
D) II, III, IV
E) II, III, V
.
Friday, March 13, 2009
Question no : 116 CO/PP Scarp factors
In SAP CO, Which of the following statements are true ?
I) Component scrap increases the requirement quantity of a component.
II) Assembly scrap increases the required quantity of all components assigned to it.
III) Operation scrap reduces the operation quantity of the following operation.
IV) Both Component scrap factor and Assembly scarp factor can be assigned to the same material master.
A) I, II
B) I, II, IV
C) II, III, IV
D) II, IV
E) I, II, III
.
I) Component scrap increases the requirement quantity of a component.
II) Assembly scrap increases the required quantity of all components assigned to it.
III) Operation scrap reduces the operation quantity of the following operation.
IV) Both Component scrap factor and Assembly scarp factor can be assigned to the same material master.
A) I, II
B) I, II, IV
C) II, III, IV
D) II, IV
E) I, II, III
.
Wednesday, March 11, 2009
Question no : 115 MM Inventory Returnable Transport Packaging
Which of the following special stock type indicator is designed for Returnable Transport Packing ?
A) R
B) T
C) P
D) M
E) G
.
A) R
B) T
C) P
D) M
E) G
.
Monday, March 9, 2009
Question no : 114 QM Master Data Inspection type de-activation in MM
In SAP QM, Which of the following can be used to de-activate Quality Inspection despite having valid Inspection Type setup in the QM view in the Material Master ?
A) Transaction code.
B) User Parameter ID.
C) Document type.
D) User exit.
E) Movement type.
.
A) Transaction code.
B) User Parameter ID.
C) Document type.
D) User exit.
E) Movement type.
.
Saturday, March 7, 2009
Question no : 113 PP MRP Stock Requirement List
In SAP PP/MM, Which of the following is not a possible default parameter in the user profile for the Stocks Requirements List ?
A) Period display.
B) Always display Header.
C) Safety time display option.
D) Safety stock display option.
E) Navigation profile selection.
.
A) Period display.
B) Always display Header.
C) Safety time display option.
D) Safety stock display option.
E) Navigation profile selection.
.
Thursday, March 5, 2009
Question no : 112 PP MRP Stock Requirement List concept
In SAP PP/MM, Which of the following is NOT TRUE about Stocks Requirement List and MRP List ?
I) Stocks Requirement List is dynamic while MRP List is static.
II) MRP List is always generated during an MRP run while the Stocks Requirement List is not.
III) Online conversion from planned order to purchase requisition is only allowed in the Stocks Requirement List and cannot be done in the MRP List.
IV) Only MRP run at the Plant level can have options to generate the MRP List.
A) II, III
B) II, IV
C) I, II, III
D) II, III, IV
E) III, IV
.
I) Stocks Requirement List is dynamic while MRP List is static.
II) MRP List is always generated during an MRP run while the Stocks Requirement List is not.
III) Online conversion from planned order to purchase requisition is only allowed in the Stocks Requirement List and cannot be done in the MRP List.
IV) Only MRP run at the Plant level can have options to generate the MRP List.
A) II, III
B) II, IV
C) I, II, III
D) II, III, IV
E) III, IV
.
Tuesday, March 3, 2009
Question no : 111 MM Purchasing Source List concepts
Which of the following are possible source of supply registered in the source list master data ?
I) Material Group.
II) Contract.
III) Scheduling Agreement.
IV) Alternative Production Plant.
V) Alternative Supply Plant.
A) I, II, III
B) II, III, IV
C) II, III, V
D) I, II, III, IV, V
E) II, III.
.
I) Material Group.
II) Contract.
III) Scheduling Agreement.
IV) Alternative Production Plant.
V) Alternative Supply Plant.
A) I, II, III
B) II, III, IV
C) II, III, V
D) I, II, III, IV, V
E) II, III.
.
Sunday, March 1, 2009
Question no : 110 MM Purchasing Release Strategy
Which of the following purchasing document's release strategy is at the item level ?
A) Purchase Requisition.
B) Purchase Order.
C) RFQ.
D) Contract.
E) Scheduling Agreement.
.
A) Purchase Requisition.
B) Purchase Order.
C) RFQ.
D) Contract.
E) Scheduling Agreement.
.