A planning file for a material is only created when:
I) The Plant itself is activated to allow MRP run in the configuration.
II) The scheduling margin key is not set to "000".
III) The material master is created with a valid MRP type in the MRP1 view.
IV) The material type used must have both Quantity and Value update for the Plant.
A) I, III, IV
B) II, IV
C) I, IV
D) II, III, IV
E) I, III
.
This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes
▼
Wednesday, April 30, 2008
Tuesday, April 29, 2008
Question no: 46 PP Execution Production order creation
What is the minimum requirements of Production Order to be created ?
A) Bills of material for the material must exist.
B) At least one operation to be included in the Production Order.
C) PRTs are necessary and included in at least one operation.
D) Material availability check must be carried out.
E) At least one user status is created.
.
A) Bills of material for the material must exist.
B) At least one operation to be included in the Production Order.
C) PRTs are necessary and included in at least one operation.
D) Material availability check must be carried out.
E) At least one user status is created.
.
Monday, April 28, 2008
Question no: 45 PP Execution Repetitive Profile
Which of the following is not part of the parameter available in the Repetitive Manufacturing Profile ?
A) De-coupling goods issue backflushing from goods receipt.
B) Error if there is inconsistencies in goods issue backflushing.
C) Allow reporting point backflushing.
D) What cost estimate basis to use for the backflushing process.
E) Refine the valuation classes used to determine the G/L accounts.
.
A) De-coupling goods issue backflushing from goods receipt.
B) Error if there is inconsistencies in goods issue backflushing.
C) Allow reporting point backflushing.
D) What cost estimate basis to use for the backflushing process.
E) Refine the valuation classes used to determine the G/L accounts.
.
Sunday, April 27, 2008
Question no: 44 MM Purchasing MPN Profile
The MPN profile controls all of the following except:
A) use of AMPL.
B) use in info record.
C) update LIS.
D) use in Quota Arrangement.
E) allow change in PO.
.
A) use of AMPL.
B) use in info record.
C) update LIS.
D) use in Quota Arrangement.
E) allow change in PO.
.
Saturday, April 26, 2008
Question no : 43 PP Planning Strategy order type "VP"
Characteristics of planned order with order type "VP" are:
I) conversion indicator is not checked.
II) user can checked the conversion indicator if necessary.
III) possibly derive from strategy group 20, 30 or 50.
IV) these planned orders cannot be firmed manually.
A) I.
B) I, II.
C) I, III.
D) II, III.
E) II, IV.
.
I) conversion indicator is not checked.
II) user can checked the conversion indicator if necessary.
III) possibly derive from strategy group 20, 30 or 50.
IV) these planned orders cannot be firmed manually.
A) I.
B) I, II.
C) I, III.
D) II, III.
E) II, IV.
.
Friday, April 25, 2008
Question no: 42 PP Planning Strategy scenario
Determine what is the correct strategy group based on the following statements:
..... make to order strategy
..... generally not for variant configuration
..... planned independent requirement is allowed
..... planned order created with "VP" until sales order arrive.
..... components with ind/coll indicator "2" can start procurement.
A) strategy group 10.
B) strategy group 20.
C) strategy group 30.
D) strategy group 40.
E) strategy group 50.
.
..... make to order strategy
..... generally not for variant configuration
..... planned independent requirement is allowed
..... planned order created with "VP" until sales order arrive.
..... components with ind/coll indicator "2" can start procurement.
A) strategy group 10.
B) strategy group 20.
C) strategy group 30.
D) strategy group 40.
E) strategy group 50.
.
Thursday, April 24, 2008
Question no: 41 QM Master Data Quality Info Record
Which of the following parameters cannot be characterized in the quality info record ?
A) Source inspection.
B) Vendor block.
C) Vendor QM system.
D) Release Quantity.
E) Dynamic Modification rule.
.
A) Source inspection.
B) Vendor block.
C) Vendor QM system.
D) Release Quantity.
E) Dynamic Modification rule.
.
Wednesday, April 23, 2008
Question no: 40 QM Certificate Incoming
Which of the scenarios for certificate receipts SAP supports:
I) Certificate receipt before goods receipts.
II) Certificate receipt with goods receipt.
III) Certificate reciept for purchase order item with inspection lot after the usage decsion.
IV) Certificate receipt for purchase order with an inspection lot after goods receipt. .
A) II, IV
B) II, III, IV
C) I, II, III
D) I, II, IV
E) I, II, III, IV
.
I) Certificate receipt before goods receipts.
II) Certificate receipt with goods receipt.
III) Certificate reciept for purchase order item with inspection lot after the usage decsion.
IV) Certificate receipt for purchase order with an inspection lot after goods receipt. .
A) II, IV
B) II, III, IV
C) I, II, III
D) I, II, IV
E) I, II, III, IV
.
Wednesday, April 9, 2008
Tuesday, April 8, 2008
Question no: 39 QM Inspection Processing concepts
Which of the following statement is correct ?
A) TRUE: Inspection lots are always created automatically.
B) FALSE: The inspection specifications from the routing cannot be altered.
C) TRUE: At inspection completion in the usage decision, the quality level is always updated.
D) FALSE: In addition to inspection results recording for characteristics, it is also possible to record defects.
E) TRUE: Results recording must always be carried out before Usage decision for all inspection lots.
.
A) TRUE: Inspection lots are always created automatically.
B) FALSE: The inspection specifications from the routing cannot be altered.
C) TRUE: At inspection completion in the usage decision, the quality level is always updated.
D) FALSE: In addition to inspection results recording for characteristics, it is also possible to record defects.
E) TRUE: Results recording must always be carried out before Usage decision for all inspection lots.
.
Question no: 38 QM Inspection Processing concepts
Which of the following is not true regarding inspection lot creation ?
I) All Inspection Lot Origns can be used to manually created inspection lots.
II) Inspection Lot Origin "05" can be used to manually create inspection lots.
III) Inspection lot can be created for Purchase Orders before goods receipt.
IV) Inspection lot can be created for Production Orders before confirmation process.
A) I, IV
B) I, III
C) I, III, IV
D) I
E) I, III
.
I) All Inspection Lot Origns can be used to manually created inspection lots.
II) Inspection Lot Origin "05" can be used to manually create inspection lots.
III) Inspection lot can be created for Purchase Orders before goods receipt.
IV) Inspection lot can be created for Production Orders before confirmation process.
A) I, IV
B) I, III
C) I, III, IV
D) I
E) I, III
.
Question no: 37 QM Inspection Processing Auto UD
When is "Auto UD" possible ?
I) setting is done at the inspection type detail in the material master.
II) setting is done at the inspection plan header for the material master.
III) result recording was completed without defect and non-conformity.
IV) inspection lot with "SKIP" status.
A) I, II, IV
B) II, III, IV
C) I, III, IV
D) I, III
E) I, II, III, IV
.
I) setting is done at the inspection type detail in the material master.
II) setting is done at the inspection plan header for the material master.
III) result recording was completed without defect and non-conformity.
IV) inspection lot with "SKIP" status.
A) I, II, IV
B) II, III, IV
C) I, III, IV
D) I, III
E) I, II, III, IV
.
Sunday, April 6, 2008
Question no : 36 MM Inventory Special Stock types
Which of the following special stock types have the vendor as one of the main tags ?
A) returnable transport packaging, sales order stock, consignment stocks.
B) returnable transport packaging, subcontracting stocks, GR-blocked stocks.
C) subcontracting stocks, GR-blocked stocks, pipeline stocks.
D) subcontracting stocks, returnable transport packaging, consignment stocks.
E) consignment stocks, returnable transport packaging, GR-blocked stocks.
.
A) returnable transport packaging, sales order stock, consignment stocks.
B) returnable transport packaging, subcontracting stocks, GR-blocked stocks.
C) subcontracting stocks, GR-blocked stocks, pipeline stocks.
D) subcontracting stocks, returnable transport packaging, consignment stocks.
E) consignment stocks, returnable transport packaging, GR-blocked stocks.
.
Saturday, April 5, 2008
Question no : 35 MM Master Data Accounting View
When an accounting view for a material master is not created ?
I) you cannot create a purchase order using that material master.
II) you can create a purchase order using that material master.
III) you can have "qty update" but not "value update".
IV) you cannot have "qty update" as well as "value update".
V) you cannot perform physical inventory of this material master.
A) I, III.
B) II, IV.
C) II, III.
D) I, IV.
E) II, V.
.
I) you cannot create a purchase order using that material master.
II) you can create a purchase order using that material master.
III) you can have "qty update" but not "value update".
IV) you cannot have "qty update" as well as "value update".
V) you cannot perform physical inventory of this material master.
A) I, III.
B) II, IV.
C) II, III.
D) I, IV.
E) II, V.
.
Friday, April 4, 2008
Question no : 34 MM Master Data Material Master Scenario
When a material master is not allowed for goods receipt into a particular storage location from the Purchase Order, it could be due to which of the following reasons ?
I) An appropriate material status has been set for the material master.
II) The "Storage Location create automatically" is not set in the configuration.
III) The Storage Location view is not created for the material master.
IV) The MRP views were accidentally set deletion flag by the administrator.
V) The intended storage location was set to dis-allow good receipt processes.
A) I, II, III
B) I, II, III, V
C) I, II, IV, V
D) II, III, IV, V
E) I, II, III, IV, V
.
I) An appropriate material status has been set for the material master.
II) The "Storage Location create automatically" is not set in the configuration.
III) The Storage Location view is not created for the material master.
IV) The MRP views were accidentally set deletion flag by the administrator.
V) The intended storage location was set to dis-allow good receipt processes.
A) I, II, III
B) I, II, III, V
C) I, II, IV, V
D) II, III, IV, V
E) I, II, III, IV, V
.
Thursday, April 3, 2008
Question no : 33 MM Organization Structuring
Which of the following is NOT TRUE about organizational structuring in MM ?
A) The same plant cannot be assigned to more then one company code.
B) A purchase organization need not necessarily be assigned to a company code.
C) A purchase organization can be assigned to more then one plant.
D) There can be only one standard purchase organization per plant.
E) A plant must be assigned with storage locations.
.
A) The same plant cannot be assigned to more then one company code.
B) A purchase organization need not necessarily be assigned to a company code.
C) A purchase organization can be assigned to more then one plant.
D) There can be only one standard purchase organization per plant.
E) A plant must be assigned with storage locations.
.
Wednesday, April 2, 2008
Question no : 32 MM Invoice/Valuation Split Valuation
Which of the following is TRUE about the characteristics of split valuation ?
A) the header material master must have price control set as "moving average price" (MAP).
B) if the header material master is of "MAP", then the valuation types assigned to it must also be "MAP".
C) the special stock indicator for split valuation is "S".
D) you cannot assign valuation types in the purchase requisition.
E) the valuation types is not available in stock determination strategies.
.
A) the header material master must have price control set as "moving average price" (MAP).
B) if the header material master is of "MAP", then the valuation types assigned to it must also be "MAP".
C) the special stock indicator for split valuation is "S".
D) you cannot assign valuation types in the purchase requisition.
E) the valuation types is not available in stock determination strategies.
.